Prevoius Weekly Reports

   weekly progress 6.1.2012
    

 

SlNo

Activity –which can be completed without caution

Description

Total Quantity

Cumulative progress up to this week

(1)

Balance  work

(2)

Cumulative delay in weeks after

Spplagmnt

(3)

Work  planned  during the week

(4)

Actual work done during the last week

(5)

Short fall in the last week 

(6)

Work 

Planned for next week

(7)

1

Re wall towards NH side

100%

34

66

32

 

 

0

0

3

Approach

 Span

 

5

 

5

0

37

-

-

-

-

4

Pier cap

2

2

0

46

 0

 0

 0

 0

5

Pile (Rly)pulikakadavuside

4

 

4

0

60

 0

 0

6

Pile (Rly)Nhside

4

4

0

60

0

0

0

0

6

Piers (Rly)

 

2

2

0

51

 0

 0

 0

 0

9

R0AD WORK

{WBM} towards pulikkakadavuside

100%

90

 

0

 

 

 

 

 

1O

Kerb/handrail  (approach portion)N.H side

200m

Inner kerbconcreting complete for a distance of  25 metres.Handrailposts  concreted for a. distance of 50 metres.Nowork in the last week.

Nil

12

Friction slab  approach portion(N.H side

200m

 

No work in the last week

 

 

 

 

     

 

 
Back
 
    
RIG IDLE AFTER CENTERING WORK.

    
    
RIG LIFTING USING HYDRA AT THE LOCATION P7.

    
    
RIG POSITIONING AND LIFTING AT P7.

    
    
BORING OF THE PILE P7B4 IN PROGRESS

    
 
    
BORING OF PILE P7B4 IN PROGRESS.

      
 

 

 

 

 

 

 

 