   Weekly progress report as on 11.11.2011
    
 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

1

PILE CHERUVATHOOR  SIDE

27

21

6

2

0

0

0

0

2

PILE PADANNA SIDE

24

12

12

0

3

0

3

3

3

PILE CAP CHERUVATHOOR SIDE

9

3

6

0

2

0

2

2

4

PILE CAP  PADANNA SIDE

8

0

8

0

2

1

1

0

5

PIER CHERUVATHOOR SIDE

9

1

8

0

1

1

0

1

6

PIER PADANNA SIDE

8

0

8

0

0

0

0

0

7

PIER CAP CHERUVATHOOR SIDE

9

0

9

0

0

0

0

2

8

PIER CAP PADANNA SIDE

8

0

8

0

0

0

0

0

9

RE/R WALL CHERUVATHOOR  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

10

RE/R WALL PADANNA SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

11

BEAM/SLAB CHERUVATHOOR  SIDE

9

0

9

0

0

0

0

0

12

BEAM/SLAB PADANNA SIDE

8

0

8

0

0

0

0

0

13

HR/FP/KERB CHERUVATHOOR  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

14

HR/FP/KERB PADANNA SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

15

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00% 

 

Availbility of Men               
Date 05-11-2011 06-11-2011 07-11-2011 08-11-2011 09-11-2011 10-11-2011 11-11-2011
Nof labours 37 7 15 23 25 24 22 

 

Material Stocking Status Required Available
Coarse Aggreagate (m3) available  
Fine Aggreagate(m3) available  
Cement(bag) 550 600
Steel(MT) 5 15 

 

 

Utility shifting        
Utilities to be shifted Status Remarks    
BSNL AP1,P9,P10 to be shifted      
KSEB in progress utility shifting near AP2 complete,
estimation yet to be received,P4 location will be shifted tomorrow.
KWA currently can be managed at site        

 

  Progress of ROB

Pile concreting in progress Done 33nos
Pile cap in progress Done 4 nos (AP2, P15,P13, P6)
Pier in progress Done AP2
Building demolition at P2,P3 location completed  
building demolition at P4 location completed  
Demolition of 2 shops in P6 location Completed  
Building demolition near P8 location In progress  
pile chipping at AP2 to P11 location completed  
Pile load test  at P7 b completed  
Site clearing at pile load test area  in progress  
Site clearing  In progress P1,P2,P3,P4,P5 locations site clearing complete
P4 location electric line shifting completed   

 

 

 

 
Back
 
    
RIG SHIFTING P5 LOCATION

    
    
PILE CAP P6 STEEL WORKS COMPLETED

    
    
P15 PIER SHUTTERING

    
    
P13 PIER SHUTTERING

    
 
    
P11 LOCATION EXCAVATION IP

    
    
AP2 SHUTTERING IP

      
 

 

 

 

 

 

 

 