   Weekly progress report as on 11.11.2011
    
 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

1

PILE THRIKKARIPUR  SIDE

33

33

0

0

0

0

0

0

2

PILE EZHIMALA SIDE

27

27

0

0

0

0

0

0

3

PILE PAYYANNUR SIDE

27

27

0

0

0

0

0

0

4

PILE CAP THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

5

PILE CAP EZHIMALA SIDE

9

9

0

0

0

0

0

0

6

PILE CAP PAYYANNUR SIDE

9

9

0

0

0

0

0

0

9

PIER THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

8

PIER EZHIMALA SIDE

9

9

0

0

0

0

0

0

9

PIER PAYYANNUR SIDE

9

9

0

0

0

0

0

0

10

PIER CAP THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

11

PIER CAP EZHIMALA SIDE

9

9

0

0

0

0

0

0

12

PIER CAP PAYYANNUR SIDE

9

9

0

0

0

0

0

0

16

RE/R WALL THRIKKARIPUR  SIDE

100%

65%

35%

0

10.00%

10.00%

5.00%

10.00%

17

RE/R WALL EZHIMALA SIDE

100%

55%

45%

0

5.00%

5.00%

0.00%

5.00%

18

RE/R WALL PAYYANNUR SIDE

100%

10

90%

0

0.00%

0.00%

0.00%

0.00%

19

BEAM/SLAB  Staging Thrikkaripur side

10

10

0

0

0

0

0

0

20

BEAM/SLAB  Bar bending and Fixing Thrikkaripur side

10

10

0

0

0

0

0

0

21

BEAM/SLAB  Shuttering  and Concreting  Thrikkaripur side

10

10

0

0

0

0

0

0

22

BEAM/SLAB  Staging Ezhimala side

7

7

0

0

0

0

0

0

23

BEAM/SLAB  Bar bending and Fixing Ezhimala side

7

7

0

0

0

0

0

0

24

BEAM/SLAB  Shuttering  and Concreting  Ezhimala side

7

7

0

0

0

0

0

0

25

BEAM/SLAB  Staging Payyanur side

10

8

2

2

0

0

2

0

26

BEAM/SLAB  Bar bending and Fixing Payyanur side

10

8

2

2

0

0

2

0

27

BEAM/SLAB  Shuttering  and Concreting Payyanur side

10

8

2

2

0

0

2

0

28

BEAM/SLAB THRIKKARIPUR  SIDE

10

10

0

0

0

0

0

0

29

BEAM/SLAB EZHIMALA SIDE

7

7

0

0

0

0

0

0

30

BEAM/SLAB PAYYANNUR SIDE

10

8

2

2

0

0

2

0

31

HR/FP/KERB THRIKKARIPUR  SIDE

100%

0

100%

30%

0.00%

0.00%

0.00%

30.00%

32

HR/FP/KERB EZHIMALA SIDE

100%

30%

70%

30%

10.00%

0.00%

0.00%

0.00%

33

HR/FP/KERB PAYYANNUR SIDE

100%

100%

0%

0

40.00%

40.00%

0.00%

0.00%

34

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00% 

 

Availbility of Men               
Date 05-11-2011 06-11-2011 07-11-2011 08-11-2011 09-11-2011 10-11-2011 11-11-2011
Nof labours 40 40 40 40 40 40 50 

 

Material Stocking Status Required Available
Coarse Aggreagate (m3) available  
Fine Aggreagate(m3) available  
Cement(bag) 300 200
Steel(MT) 3 27 

 

Utility shifting  
Utilities to be shifted Status
BSNL completed
KSEB completed
KWA completed
Others completed 

 

 

PROGRESS OF WORK UPTO 11-11-11
Pier cap concreting (Total no of pier cap- 29) completed  
Slab  Thrikkaripur side (  10 nos) completed 10 nos done
Slab Ezhimala side ( 7 nos) completed 7nos done
Slab Payyanur side ( 10 nos) Remaining two can be done
only after railway portion is done
8 nos done
 Retaining wall/RE wall panel casting- Ezhimala side In progress done 55%
Retaining wall Thrikkaripur side (RHS) In progress Done 75%
Handrail & Kerb payyannur side completed  
Handrail & Kerb Thrikaripur side In progress P6-7 completed
Expansion joint: Payyannur side completed  
Expansion joint: Ezhimala side In progress 2 locations- P11,P12 complete 
Expansion joint: Thrikkarippur side In progress 2 span completed
Kerb In progress (total 22 spans complete) 
 
Back
 
    
RE PANEL FINAL WORKS TKRP

    
    
RE PANEL WORKS EZHIMALA SIDE

    
    
RE PANEL FINAL WORKS TKRP

    
    
RAILWAY PORTION WORKS SLOW PROGRESS

    
 
    
HANDRAIL WORKS IP TRKP SIDE

      
 

 

 

 

 

 

 

 