   Weekly progress report as on 04.11.2011
    
 

Si No

Activity Description

Total Quantity

Cumulative progress upto 03.11.11

Balance  work up to 03.11.11

Cumulative delay in Qty up to 03.11.11

Work  planned  during the week

Actual work done during the week

delay in Qty up to this week

Work  Planned for next week

No of days remaing for completion as per the weekly plan

1

PILE  Palarivattom side(Approach portion)

31

28

3

0

0

0

0

0

kwa line to be shifted

2

PILE Palarivattom side(railway portion)

6

0

6

0

0

0

0

0

"      "

3

PILE vytilla side(Approach portion)

42

0

42

0

0

0

0

0

"      "

4

PILE vytilla side(railway portion)

6

0

6

0

0

0

0

0

"      "

5

PILE CAP Palarivattom side(Approach portion)

8

7

1

1

1

1

0

0

"      "

6

PILE CAP Palarivattomside(railway portion)

1

0

1

0

0

0

0

0

"      "

7

PILE CAP vytilla side(Approach portion)

9

0

9

0

0

0

0

0

"      "

8

PILE CAP vytilla side(railway portion)

1

0

1

0

0

0

0

0

"      "

9

PIER Palarivattom side(Approach portion)

8

7

1

0

3

1

0

0

 

10

PIER Palarivattomside(railway portion)

1

0

1

0

0

0

0

0

 

11

PIER Vytilla side(Approach portion)

9

0

9

0

0

0

0

0

"      "

12

PIER vytilla side(railway portion)

1

0

1

0

0

0

0

0

"      "

13

PIER  CAP Palarivattom side(Approach portion)

8

7

1

0

0

0

2

2

 

14

GIRDER Palarivattom side(Approach portion)

7

1

6

0

1

1

0

1

 

15

PIER CAP Palarivattomside(railway portion)

1

0

1

0

0

0

0

0

 

16

PIER CAP  Vytilla side(Approach portion)

9

0

9

0

0

0

0

0

"      "

17

PIER CAP vytilla side(railway portion)

1

0

1

0

0

0

0

0

"      "

18

RE WALL PANEL

355

355

0

0

0

1

0

0

 

WORKS AT SITE  
   
GIRDER  
A2 P15-  concreting completed on 02.11.11
P15 P14-Sheathing pipe fixing  
P14 P13-Staging Work in progress  

 

 

Labour Report              
               
Date 28.10.11 29.10.11 30.10.11 31.10.11 01.11.11 02.11.11 03.11.11
Day Fri Sat Sun Mon Tue Wed Thurs
Climate sunny in the morn& rainy in  the evening sunny in the morn& rainy in  the evening sunny in the morn& rainy in  the evening sunny in the morn& rainy in  the evening sunny in the morn& rainy in  the evening rain till 11.30 am sunny 
No.of labours 23 23 14 17 16 19 21 

 

Availability of Material     
Materials Required for week ending on 10.11.11 Available as on 04.11.2011
Fine aggregate(M3) Ready Mix Concrete
Coarse aggregate(M3)
Cement(BAG)
Steel(TONN) 3 43 

 

Progress of work

Description Progress/Completed  Remarks 
Pile Concreting  in progress Done 28 nos
Pile cap In progress Done 7 nos
Pier concreting In progress Done 7 nos 
Pier cap  In progress Done 7 nos, 
P15,AP2 pedestal concrete  completed  
staging for P15-AP2 girder Completed  
AP2-P15 girder reinforcement Completed  
AP2-P15 girder concreting Completed 02.11.11
P15-P14 girder staging Completed  
P15-P14 girder reinforcement completed  
P14-P13 girder shuttering In progress  
Electricity line shifting for P9 location completed  
Electricity line shifting for RE wall at Palarivattom side not done Sub Engineer inspected site on 03.11.11
Railway trees cut near P11, RP1 completed Location cleared for piling
KWA lines shifting towards Vyttila side In progress Fabricated flanges will reach site on 07.11.11. AE KWA was requested to commence works on palarivattom side.
KSEB 2 overhead line shifting completed  
KSEB utility shifting    KSEB post shifting in progress
Pile P9 KWA line shifting pending water supply line to railway broke    at 07-05-2011 
Pile load test P14, P4 completed  
RE Wall panel casting (355nos) completed done 355nos
Shifting of railway signal cable at RP1 commenced completed on 01.11.11. Rail tel cable shifting will be complete by 05.11.11.
Pedestal P11 completed   
 
Back
 
    
SLUMP TEST A2 P15

    
    
RLY SIGNAL CABLE BOX SHIFTING

    
    
RAIL TEL CABLE SHIFTING

    
    
GIRDER CONCRETING A2 P15

    
 
    
CUTTING OF HT STRANDS

    
    
A2 P15 CURING

      
 

 

 

 

 

 

 

 