Works during this week
|
|
WMM,Dismantling and Removing road section,tripod ersction,winch settingetc
|
Works proposed for next week
|
|
Pre construction activities for piling work,Pile-3 no's,service road on Anayara side including
|
|
|
sectioning of road, GSBC, one layer WMM.
|
work GSBC and one layer of WMM.
|
|
|
Testing of Materials
|
|
Field Density test, Gredation test, Moisture content before compaction are Conducted
|
|
|
Lab trial of mix design for concrete M35
|
|
|
|
|
Quality of work
|
|
Obtained test results are with in the permissible limit.
|
Remarks
|
|
One telephone junction BOX and 7 telephone post yet to be removed on Anayaraside
|