   Weekly progress report as on 28.10.2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

No of days remaing for completion as per the weekly plan

Remarks

 

1

PILE Muthambi side

27

18

9

0

0

0

0

 

 

 

 

2

PILE Thamarassery side

33

1

32

0

6

1

0

6

 

 

 

3

PILE NH SIDE

30

0

30

0

4

0

0

4

 

 

 

4

PILE CAP Muthambi SIDE

9

0

9

0

2

0

0

2

 

P15,P14,P13 pile cap excavation complete

 

4

PILE CAP Thamarassery SIDE

11

0

11

0

0

0

0

0

 

 

 

5

PILE CAP NH SIDE

10

0

10

0

0

0

0

0

 

 

 

6

PIER Muthambi  SIDE

9

0

9

0

0

0

0

0

 

 

 

7

PIER Thamarassery SIDE

11

0

11

0

0

0

0

0

 

 

 

8

PIER NH SIDE

10

0

10

0

0

0

0

0

 

 

 

9

PIER CAP Muthambi  SIDE

9

0

9

0

0

0

0

0

 

 

 

10

PIER CAP Thamarassery SIDE

11

0

11

0

0

0

0

0

 

 

 

11

PIER CAP NH SIDE

10

0

10

0

0

0

0

0

 

 

 

12

RE/R WALL Muthambi side

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

13

RE/R WALL Thamarassery side SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

14

RE/R WALL NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

15

BEAM/SLAB Muthambi SIDE

8

0

8

0

0

0

0

0

 

 

 

16

BEAM/SLAB Thamarassery SIDE

10

0

10

0

0

0

0

0

 

 

 

17

BEAM/SLABNH SIDE

10

0

10

0

0

0

0

0

 

 

 

18

HR/FP/KERB Muthambi SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

19

HR/FP/KERB thamarassery SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

20

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

21

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

22

Deck Slab

 

 

 

 

 

 

 

 

 

 

 

23

Utility shifting

 

 

 

 

 

 

 

 

 

KSEB estimate 1st part complete. With Executive engineer for signature

 

 

Availbility of Men

 

 

 

 

 

 

 

Date

22/10/2011

23/10/2011

24/10/2011

25/10/2011

26/10/2011

27/10/2011

28/10/2011

Nof labours

21

21

21

21

21

21

21

 

Material Stocking Status

Required

Available

Coarse Aggreagate (m3)

100

120

Fine Aggreagate(m3)

100

120

Cement(bag)

1000

1000

Steel(MT)

18

33

 
Back
 
    
PILE RIG SETTING IN NH AREA

    
    
PILE P27B CONCRETING

    
    
PILE P27B CAGE LOWERING

    
    
PILE P27B BORING

    
 
    
PILE AP1B RIG SETTING UP

    
    
FILLING TOWARDS NH

      
 

 

 

 

 

 

 

 