   Weekly progress report as on 21.10.2011
    
 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

1

PILE THRIKKARIPUR  SIDE

33

33

0

0

0

0

0

0

 

2

PILE EZHIMALA SIDE

27

27

0

0

0

0

0

0

 

3

PILE PAYYANNUR SIDE

27

27

0

0

0

0

0

0

 

4

PILE CAP THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

 

5

PILE CAP EZHIMALA SIDE

9

9

0

0

0

0

0

0

 

6

PILE CAP PAYYANNUR SIDE

9

9

0

0

0

0

0

0

 

9

PIER THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

 

8

PIER EZHIMALA SIDE

9

9

0

0

0

0

0

0

 

9

PIER PAYYANNUR SIDE

9

9

0

0

0

0

0

0

 

10

PIER CAP THRIKKARIPUR  SIDE

11

11

0

0

0

0

0

0

 

11

PIER CAP EZHIMALA SIDE

9

9

0

0

0

0

0

0

 

12

PIER CAP PAYYANNUR SIDE

9

9

0

0

0

0

0

0

 

16

RE/R WALL THRIKKARIPUR  SIDE

100%

50%

50%

0

10.00%

10.00%

0.00%

10.00%

 

17

RE/R WALL EZHIMALA SIDE

100%

45%

55%

0

0.00%

5.00%

0.00%

5.00%

 

18

RE/R WALL PAYYANNUR SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

19

BEAM/SLAB  Staging Thrikkaripur side

10

10

0

0

0

0

0

0

 

20

BEAM/SLAB  Bar bending and Fixing Thrikkaripur side

10

10

0

0

0

0

0

0

 

21

BEAM/SLAB  Shuttering  and Concreting  Thrikkaripur side

10

10

0

0

0

0

0

0

 

22

BEAM/SLAB  Staging Ezhimala side

8

8

0

0

0

0

0

0

 

23

BEAM/SLAB  Bar bending and Fixing Ezhimala side

8

8

0

0

0

0

0

0

 

24

BEAM/SLAB  Shuttering  and Concreting  Ezhimala side

8

8

0

0

0

0

0

0

 

25

BEAM/SLAB  Staging Payyanur side

9

8

1

1

0

0

1

0

 

26

BEAM/SLAB  Bar bending and Fixing Payyanur side

9

8

1

1

0

0

1

0

 

27

BEAM/SLAB  Shuttering  and Concreting Payyanur side

9

8

1

1

0

0

1

0

 

28

BEAM/SLAB THRIKKARIPUR  SIDE

10

10

0

0

0

0

0

0

 

29

BEAM/SLAB EZHIMALA SIDE

8

8

0

0

0

0

0

0

AP2-P16 slab complete

30

BEAM/SLAB PAYYANNUR SIDE

9

8

1

1

0

0

1

0

 

31

HR/FP/KERB THRIKKARIPUR  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

32

HR/FP/KERB EZHIMALA SIDE

100%

25%

75%

0

0.00%

5.00%

0.00%

10.00%

 

33

HR/FP/KERB PAYYANNUR SIDE

100%

30%

70%

0

10.00%

10.00%

0.00%

10.00%

Handrail fixing on payyannur side planned

34

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

  

 

PROGRESS OF WORK UPTO 21-10-11
ROB at Payyannur    
Pier cap concreting (Total no of pier cap- 29) completed  
Slab  Thrikkaripur side (  10 nos) completed 10 nos done
Slab Ezhimala side ( 7 nos) completed 7nos done(AP2-P16 complete this week)
Slab Payyanur side ( 11 nos) In progress 8 nos done
 Retaining wall/RE wall panel casting- Ezhimala side In progress done 50%
Raft concrete for retaining wall in RHS of Thrikaripur side In progress done for 22m
Retaining wall Thrikkaripur side (RHS) In progress Done 60%
Kerb payyannur side completed  
Expansion joint: Payyannur side completed  
Expansion joint: Ezhimala side In progress 2 locations- P11,P12 complete 
Kerb: Ezhimala side In progress 4 span complete-P10-P11,P11-P12,P12-13,P13-P14
Kerb In progress 1 span complete this week(total 12 span complete) 

 

 

 
Back
 
    
SERVICE ROAD LHS TRKP SIDE

    
    
RE PANEL WORKS AT EZHIMAL SIDE

    
    
RE PANEL AND SERVICE ROAD WORKS AT TRKP

    
    
RAILWAY PIER IP

    
 
    
HANDRAIL WORKS IP PAYYANNUR SIDE

    
    
60_40 MM STACKING

      
 

 

 

 

 

 

 

 