   Weekly progress report as on 21.10.2011
    
 

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

No of days remaing for completion as per the weekly plan

Remarks

PILE CHERUVATHOOR  SIDE

27

21

6

2

0

0

0

0

 

 

PILE PADANNA SIDE

24

7

17

0

0

1

0

1

 

P3 c pile complete

PILE CAP CHERUVATHOOR SIDE

27

0

27

0

0

0

0

0

 

 

PILE CAP  PADANNA SIDE

24

0

24

0

0

0

0

0

 

 

PIER CHERUVATHOOR SIDE

9

0

9

0

0

0

0

0

 

 

PIER PADANNA SIDE

8

0

8

0

0

0

0

0

 

 

PIER CAP CHERUVATHOOR SIDE

9

0

9

0

0

0

0

0

 

 

PIER CAP PADANNA SIDE

8

0

8

0

0

0

0

0

 

 

RE/R WALL CHERUVATHOOR  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

RE/R WALL PADANNA SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

BEAM/SLAB CHERUVATHOOR  SIDE

9

0

9

0

0

0

0

0

 

 

BEAM/SLAB PADANNA SIDE

8

0

8

0

0

0

0

0

 

 

HR/FP/KERB CHERUVATHOOR  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

HR/FP/KERB PADANNA SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

  

 

 

Availbility of Men 

             
Date 15-10-2011 16-10-2011 17-10-2011 18-10-2011 19-10-2011 20-10-2011 21-10-2011
Nof labours 15 15 15 15 25 25 25 

 

 

Material Stocking Status

 

Required

 

Available

Coarse Aggreagate (m3) 40 300
Fine Aggreagate(m3) 20 5
Cement(bag) 420 1200
Steel(MT) 3.5 20 

 

 

PROGRESS OF WORK UPTO 21-10-11

  ROB at Cheruvathur    
  Pile concreting in progress Done 29nos(P7 c complete this week)
  PCC for pile cap at AP2 location  completed  
  AP2,P15,P13 consolidation and marking completed  
  Building demolition at P2,P3 location completed  
  building demolition at P4 location completed  
  Demolition of 2 shops in P6 location Completed  
  Building demolition near P8 location In progress  
  KSEB utility shifting near AP2 Completed  
  BSNL & OFC cable shifting  completed  
  pile chipping at AP2 to P11 location completed  
  Pile load test  at P7 b In progress load releasing in progress
  Site clearing  In progress P1,P2,P3,P4,P5 locations site clearing complete
  P4 location electric line shifting   to be shifted 

 

 