Prevoius Weekly Reports

   Weekly progress report as on 21.10.2011
    
 

1

Works during this week    

 

To divert the traffic in the site, the service road work is in progress at Petta side of ROB project.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

Works proposed for next week

 

Mobilisation of Pilling equipments is in progress. Pre construction activities for piling work, Pilling.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

Testing of Materials                    

 

Field Density test, Gredation test, Moisture content before compaction are Conducted

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

Quality of work                               

 

Obtained test results are with in the permissible limit.

 

 

 

 

 

 

 

 

 

 

 

3

Remarks                                       

 

At Anayara side of ROB ; the transformer shifted,Electric posts not shifted

 

 

 
Back
 
    
TRANSFORMER SHIFTING

    
    
ROAD TRAFFIC DIVERSION

    
    
PILING EQUIPMENT MOBILIZATION

      
 

 

 

 

 

 

 

 