   Weekly progress report as on 21.10.2011
    
 

SlNo

Activity –which can be completed without caution

Description

Total Quantity

Cumulative progress up to this week

(1)

Balance  work

(2)

Cumulative delay in weeks after

Spplagmnt

(3)

Work  planned  during the week

(4)

Actual work done during the last week

(5)

Short fall in the last week 

(6)

Work 

Planned for next week

(7)

No of days remaining for completion as per the weekly plan

1

Re wall towards NH side

100%

34

66

32

 

 

0

0

 0

3

Approach

 Span

 

5

 

5

0

37

-

-

-

-

 

4

Pier cap

2

2

0

46

 0

 0

 0

 0

 0

5

Pile (Rly)pulikakadavuside

4

 

4

0

60

 0

 0

0

6

Pile (Rly)Nhside

4

4

0

60

0

0

0

0

0

6

Piers (Rly)

 

2

2

0

51

 0

 0

 0

 0

 

9

R0AD WORK

{WBM} towards pulikkakadavuside

100%

90

 

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1O

Kerb/handrail  (approach portion)N.H side

200m

Inner kerbconcreting complete for a distance of  25 metres.Handrailposts  concreted for a. distance of 50 metres.Nowork in the last week.

 

Nil

 

 

 

 

 

12

Friction slab  approach portion(N.H side

200m

 

No work in the last week

 

 

 

 

     

 

 

 

Material Stocking Status

 

 

 

 

Coarse Aggreagate(m3)

8

10

Remarks

 

Fine Aggreagate(m3)

 5

 9

 

 

Cement(bag)

 9

 8

 

 

Steel(MT)

 6

6

 

 

 RE blocks

 2150 available at site

 

 

  

 

 

Utility shifting

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

BSNL

 

 

 

 

KSEB

 nohindrance

 

 

 

KWA

 

 .

 

 

Others

 

No hindrance

 

 

  

 

 Climate and labour details

 

DATE

15-10-2011

16-10-2011

17-10-2011

18-10-2011

19-10-2011

20-10-2011

21-10-2011

Weather

cloudy

Sunny

Sunny

Sunny

cloudy

sunny

Sunny

Labour

8

9

8

9

8

9

9

 

 

Daily Activity Report

 

 

1

15-10-2011

Rig dismantling at the location P8

2

16-10-2011

No work

3

17-10-2011

Arrangements for pile excavation at location P8

4

18-10-2011

Commencement of pile excavation at P8

Signal cable shifted from the drain at N.H side.

 

5

 

6

  

7

 

 

19-10-2011

 

20-10-2011

 

21-10-2011

Pile excavation at the location P8 for pile cap

..

Pile excavation at the location P8 for pile cap

 

Pile excavation at the location P8 for pile cap

 

 
•Concreting of the Pile  P8(5) , P8(3),P8(2),P8(1),P8(4) completed.
•Concreting of  pile cap at P8 planned for the next week.
•Caution not yet obtained to start piling work at P7 location 
 
Back
 
    
SIGNAL CABLES SHIFTED FROM THE DRAIN AT N.H SIDE

    
    
PILE EXCAVATION IN PROGRESS AT P8

    
    
PILE EXCAVATION AT P8 LOCATION

    
    
EXCAVATION IN PROGRESS WITH THE LEVEL CHECK

    
 
 
 

 

 

 

 

 

 

 