weekly Progress as on 30.05.15
 

Progress Report of upgrading Airport Seaport Road Phase 1 as on 30.05.15

 

Sl. No.

BOQ no

Item Description

Unit

Total

Quantity

Up to date

Quantity

Percentage

 

 

 

 

 

1

1.01

Clearing and grubbing road land

HA

3.9

2.891

74%

2

1.09

Excavation for roadway

Cum

1320

1011

77%

3

1.10

Earthwork excavation at embankment foundation

Cum

30210

20218

67%

4

1.11

Loosening, leveling and Compacting

Cum

1240

2802

226%

5

1.12

Construction of sub-grade and earthen shoulders

Cum

5290

0

0%

6

1.13

GSB (Grade I)

Cum

8050

5517

69%

7

1.14

Wet Mix Macadam (WMM)

Cum

6900

4275

62%

8

1.15

Primer coat (0.75KG/Sqm)

Sqm

24370

16866

69%

9

1.16

Tack coat

Sqm

50230

122114

243%

10

1.17

BM

Cum

500

1354

271%

11

1.18

DBM

Cum

5790

4167

72%

12

1.19

BC

Cum

1860

1780

96%

13

1.20

Kerb stone

Rm

8800

4274

49%

14

1.27

Construction of embankment (road way cutting material)

Cum

3890

3467

89%

15

1.28

PCC M15 for sub-structure - for culverts , drain, utility duct etc

Cum

1050

766

73%

16

1.29

PCC M25 for sub-structure/super structure etc for culverts , drain, utility duct

Cum

5070

2193

43%

17

1.30

HYSD bar reinforecemnt in sub -structure

MT

510

183

36%

 

1.31

Painting two coats of Enamal paint

Sqm

5870

355

6%

 

1.32

Providing and layiong of hot applied thermoplastic paint

Sqm

1860

1903

102%

 

1.33

Supply and installation of delineators

Nos

44

79

180%

 

1.34

Providing and fixing of road studs

Nos

7500

1800

24%

 

1.35

Providing and fixing of red reflectors

Nos

2200

843

38%

18

1.36

M20 grade concrete guard posts 200 x 200 mm x1.25 m

Nos

550

57

10%

19

1.37

Cautionery , mandatory and informatory sign

 

 

 

 

20

a

Triangular 900mm size

Nos

51

51

100%

21

b

Circular 600mm size

Nos

6

20

333%

22

c

Informatory/ Mandatory signs 800mm x600mm

Nos

26

0

0%

23

d

900mm high octagon

Nos

4

1

25%

24

1.38

Place identification retro-reflectorised sign

 

 

 

 

25

a

OHM for culverts, openings etc

Sqm

3.6

5.6

156%

26

b

Chevron signs 600mmx 600mm

Sqm

6.6

6.4

97%

27

c

Chevron signs 1200mmx 600mm

Sqm

4.4

0

0%

28

1.43

Tree planting

Nos

350

180

51%

 