Prevoius Weekly Reports

   weekly progress 15.7.2011
    

 

SlNo

Activity –which can be completed without caution

Description

Total Quantity

Cumulative progress up to this week

(1)

Balance  work

(2)

Cumulative delay in weeks after

Spplagmnt

(3)

Work  planned  during the week

(4)

Actual work done during the last week

(5)

Short fall in the last week 

(6)

Work 

Planned for next week

(7)

No of days remaining for completion as per the weekly plan

Remarks

1

Re wall towards NH side

100%

34

66

32

 

 

0

0

 0

.

3

Approach

 Span

 

5

 

5

0

37

-

-

-

-

 

 

4

Pier cap

2

1

3

42

 0

 0

 0

 0

 0

 pier cap cannot be planned for next week due to change in design

5

Pile (Rly)pulikakadavuside

4

 

4

0

60

 0

 0

0

 

6

Pile (Rly)Nhside

4

4

0

60

0

0

0

0

0

 

6

Piers (Rly)

 

2

2

0

51

 0

 0

 0

 0

 

3rdlift of pier P1 deshutteringwork completed

9

R0AD WORK

{WBM} towards pulikkakadavuside

100%

90

 

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1O

Kerb/handrail  (approach portion)N.H side

200m

Kerbshuttering  and reinforcement in progress i

 

nil

35

26

       9

 

 10

 

 

12

Friction slab  approach portion(N.H side

200m

 

friction slab  completed upto28 m total

 

 

Friction slab concrtecompleted for a length of 10 metres

Only 3m concreting completed due to rain

      7

Friction slab concrteplanned for 10 metres

 

 

 

 

Activities which cannot be completed without caution

1

Pile 10Nos

Pier -2Nos

Pier Cap-2 Nos

Deck -3slab 

 

Material Stocking Status

 

 

 

 

Coarse Aggreagate (m3)

12

18

Remarks

 

Fine Aggreagate(m3)

 15

 25

 .

 

Cement(bag)

 31

 67

 

 

Steel(MT)

 6

 15

 

 

 RE blocks

 2150 available at site

 

 

  

 

Utility shifting

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

BSNL

 

 

 

 

KSEB

 nohindrance

 

 

 

KWA

 

 .

 

 

Others

 

No hindrance

 i

 

  

 

 

 
Back
 
    
CAPPING WORK AT N.H APPROACH(13.7.2011)

    
    
HANDRAIL POST REINFORCEMENT AT N.H SIDE APPROACH(12.7.2011)

    
    
TEMPERORY DIVERSION ROAD MADE BY N.H ACROSS OUR APPROACH( 14.7.2011).

    
    
SHUTTERING WORK -OUTER KERB N.H SIDE APPROACH(11.7.2011).

    
 
    
FRICTION SLAB N.H SIDE APPROACH(9.7.2011).

    
    
FRICTION SLAB REINFORCEMENT AT N.H SIDE APPROACH (15.7.2011)

      
 

 

 

 

 

 

 

 