Prevoius Weekly Reports

   17-06-2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress uptolast week

Balance  work up to last week

Cumulative delay in Qty up to this week

Work  planned during the week

Actual work done during the week

Work  Planned for next week

Remarks

1

PILE RAILWAY SPAN

20

0

20

20

0

0

0

 

2

PILE CAP RAILWAY SPAN

4

0

4

4

2

0

0

 

3

PIER RAILWAY SPAN

4

0

4

4

0

0

0

 

4

PIER CAP CALICUT  SIDE

10

10

0

0

0

0

0

 

5

PIER CAP NH SIDE

11

11

0

0

0

0

0

 

6

PIER CAP RAILWAY SPAN

4

0

4

4

0

0

0

 

7

RE/R WALL  CALICUT  SIDE

100%

0.00%

100%

0

0.00%

0.00%

0.00%

 

8

RE/R WALL  NH SIDE

100%

17.00%

83%

0

3.00%

3.00%

3.00%

 

9

BEAM/SLAB  Staging CALICUT  SIDE

10

3

6

1

1

0

1

 

10

BEAM/SLAB  Bar bending and Fixing CALICUT  SIDE

10

3

7

1

1

0

1

 

11

BEAM/SLAB  Shuttering  and Concreting  Calicut SIDE

10

3

7

1

0

0

1

 

12

BEAM/SLAB  Staging NH SIDE

11

3

8

0

1

1

1

 

13

BEAM/SLAB  Bar bending and Fixing NH  SIDE

11

3

8

0

1

0

1

 

14

BEAM/SLAB  Shuttering  and Concreting  NH  SIDE

11

3.5

7.5

0

0.5

0.5

0

 

15

BEAM/SLAB  RAILWAY SPAN

3

0

3

1

0

0

0

 

16

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

 

17

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

 

18

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

 

19

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

Availability of Men

 

 

 

 

 

 

 

Date

11.06.11

12.06.11

13.06.11

14.06.11

15.06.11

16.06.11

17.06.11

No of labours

69

69

71

70

52

52

52

 

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

 

Material

Required

Available

 

 

 

 

 

Coarse Aggreagate (m3)

60

30

 

 

 

 

 

Fine Aggreagate(m3)

40

25

 

 

 

 

 

Cement(bag)

512

1845

 

 

 

 

 

Steel(MT)

11

111

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

 

 

 

BSNL

nil

 

 

 

 

 

 

KSEB

nil

 

 

 

 

 

 

KWA

nil

 

 

 

 

 

 

Others

nil

 

 

 

 

 

 

 
Back
 
    
P3- P4 GIRDER (17.06.2011)

    
    
R E WALL PORTION (14.06.2011)

    
    
P3-P4 GIRDER (13.06.2011)

    
    
P3-P4 GIRDER (12.06.2011_

    
 
    
P17-P16 SLAB CONCRETING (12.06.2011)

    
    
P17-P16 DECK SLAB (11.06.32011)

      
 

 

 

 

 

 

 

 