   weekly progress as on20.5.2011
    

 

 

SlNo Utilities Activities Date  Status  Remarks
1 KWA Joint Inspection with AE,KWA,Angamali 17.3.2011 DD submitted Pipe lines to be shifted
2 BSNL Joint Inspection with DE, BSNL,Angamali 17.3.2011 Estimate to be received  
3 KSEB Joint Inspection with Sub Engineer, KSEB,Karukutti 23.3.2011 DD submitted Electric  lines to be shifted
4   Joint Inspection with AE,KSEB,Angamali 8.4.2011 DD submitted   
5 KWA Joint Inspection with AE,Project division,KWA,Aluva 1.4.2011 DD submitted Pipe lines to be shifted 

work status- 3 pile on Nh side completed

  

 
Back
 
    
DRAIN WORK TOWARDS PULIYANAM SIDE IN PROGRESS - 18.5.2011

    
    
PILE CONCRETING AT P7B 13.5.2011

    
    
TRIPOD ARRANGEMENT FOR PILING 16.5.2011

    
    
PILE REINFORCEMENT LOWERING 13.5.2011

    
 
    
PILE CONCRETING AT P8C-18.5.2011

      
 

 

 

 

 

 

 

 