Prevoius Weekly Reports

   29/04/2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

1

PILE RAILWAY SPAN

20

0

20

20

0

0

0

0

 

2

PILE CAP RAILWAY SPAN

4

0

4

3

2

0

4

4

 

3

PIER RAILWAY SPAN

4

0

4

3

0

0

3

0

 

4

PIER CAP CALICUT  SIDE

10

7

3

3

3

0

3

3

 

5

PIER CAP NH SIDE

11

7

4

3

4

3

1

1

 

6

PIER CAP RAILWAY SPAN

4

0

4

1

0

0

2

0

 

7

RE/R WALL  CALICUT  SIDE

100%

100%

100%

0

0.00%

2.00%

0.00%

0.00%

 

8

RE/R WALL  NH SIDE

100%

12.00%

88%

0

0.00%

2.00%

0.00%

0.00%

 

9

BEAM/SLAB  Staging CALICUT  SIDE

10

2

8

0

0

0

0

1

 

10

BEAM/SLAB  Bar bending and Fixing CALICUT  SIDE

10

1

9

0

0

0.5

0

1

 

11

BEAM/SLAB  Shuttering  and Concreting  Calicut SIDE

10

0

10

0

1

1

0

o

 

12

BEAM/SLAB  Staging NH SIDE

11

3

8

5

1

0

0

1

 

13

BEAM/SLAB  Bar bending and Fixing NH  SIDE

11

3

8

4

0

0

0

1

 

14

BEAM/SLAB  Shuttering  and Concreting  NH  SIDE

11

1

10

1

1

1

0

1

 

15

BEAM/SLAB  RAILWAY SPAN

10

1

9

0

0

0

0

0

 

16

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

17

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

18

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

19

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 

Availbilityof Men

 

 

 

 

 

 

 

Date

23.04.11

24.04.11

25.04.11

26.04.11

27.04.11

28.04.11

29.04.11

No of labours

39

50

46

63

49

50

50

 

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

 

Material

Required

Available

 

 

 

 

 

Coarse Aggreagate (m3)

35

60

 

 

 

 

 

Fine Aggreagate(m3)

25

45

 

 

 

 

 

Cement(bag)

300

1714

 

 

 

 

 

Steel(MT)

10

95

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

 

 

 

BSNL

nil

 

 

 

 

 

 

KSEB

nil

 

 

 

 

 

 

KWA

nil

 

 

 

 

 

 

Others

nil

 

 

 

 

 

 

 
Back
 
    
AP1-P1 SLAB CONCRETING (28.04.2011)

    
    
RETAINING WALL CONCRETING (27.04.2011)

    
    
P18-P17 GIRDER WORK (26.04.2011)

    
    
P1-P2 STAGING (26.04.2011)

    
 
    
AP2-P19 SLAB CONCRETING (26.04.2011)

    
    
AP1- P1 SLAB WORK (26.04.2011)

      
 

 

 

 

 

 

 

 