Untitled Document
Road to Prosperity
Site last updated on:  12-12-2020 | You are visitor: 7888449
Completed Projects Projects Under Construction Citizen Services Careers Right to Service


Prevoius Weekly Reports

   16/04/2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

1

PILE RAILWAY SPAN

20

0

20

20

0

0

0

0

2

PILE CAP RAILWAY SPAN

4

0

4

3

2

0

4

0

3

PIER RAILWAY SPAN

4

0

4

3

0

0

3

0

4

PIER CAP CALICUT  SIDE

10

7

3

3

3

0

3

3

5

PIER CAP NH SIDE

11

7

4

3

4

3

1

1

6

PIER CAP RAILWAY SPAN

4

0

4

0

0

0

0

0

7

RE/R WALL  CALICUT  SIDE

100%

6%

94%

0

0.00%

4%

0.00%

0.00%

8

RE/R WALL  NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

9

BEAM/SLAB  Staging CALICUT  SIDE

10

1.8

8.2

0

0

0

0

1

10

BEAM/SLAB  Bar bending and Fixing CALICUT  SIDE

10

1

9

0

0

0

0

1

11

BEAM/SLAB  Shuttering  and Concreting  Calicut SIDE

10

1

9

0

0

0

0

o

12

BEAM/SLAB  Staging NH SIDE

11

2

9

5

1

0.8

0.2

1

13

BEAM/SLAB  Bar bending and Fixing NH  SIDE

11

2

9

4

0

0

0

1

14

BEAM/SLAB  Shuttering  and Concreting  NH  SIDE

11

1

10

1

0

0

0

1

15

BEAM/SLAB  RAILWAY SPAN

3

0

3

0

0

0

0

0

16

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

17

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

18

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

19

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

Availability of Men

 

 

 

 

 

 

 

Date

09.04.11

10.04.11

11.04.11

12.04.11

13.04.11

14.04.11

15.04.11

No of labours

44

45

45

48

35

60

59

 

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

 

Material

Required

Available

 

 

 

 

 

Coarse Aggreagate (m3)

67

150

 

 

 

 

 

Fine Aggreagate(m3)

45

100

 

 

 

 

 

Cement(bag)

630

3000

 

 

 

 

 

Steel(MT)

15

131

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

 

 

 

BSNL

nil

 

 

 

 

 

 

KSEB

nil

 

 

 

 

 

 

KWA

nil

 

 

 

 

 

 

Others

nil

 

 

 

 

 

 

 
Back
 
    
AP1-P1 BEEM CONCRETING(12.04.2011)

    
    
P12-PIERCAP WORK(12.04.2011)

    
    
AP2-P19 SHUTTERING (11.04.2011)

    
    
AP1-P1 SHUTTERING WORK(11.04.2011)

    
 
    
P1-P2 SAME AS ON 05.04.11(09.04.2011)

    
    
PCC FOR RETAINING WALL (09.04.2011)

      
 

 

 

 

 

 

 

 

Untitled Document