   progress up to 8.4.2011
    

 

SlNo Activities Date  Remarks
1 Joint Inspection with Axe and AE,KWA,Pallimukku 21.2.2011 Estimate is to be received
2 Joint Inspection with DE, BSNL,Palarivattom 23.3.2011 DE,informed that there is no BSNL cable to be  removed
   DE, BSNL,Vytilla   DE,informed that there is no BSNL cable to be  removed
3 Joint Inspection with Sub Engineer, KSEB 23.3.2011 DD submitted to Ae KSEB
4 Joint Inspection with BPCL 24.3.2011  
5 Pile Load Test  23.3.2011 to 27.3.2011 Completed on 27.3.2011  6
Joint Inspection with AE,AXE and EE KWA 2.4.2011  
Piling started at P15 1.4.2011   
8 Joint Inspection with AE,KSEB 11.4.2011 for shifting Electrical posts near the level cross
9 Joint Inspection with AE,BSNL 11.4.2011  
10             4 piles completed     
 
Back
 
    
SOIL TESTING NEAR RP-2

    
    
SOIL TESTING NEAR RP-2.

    
    
RIGS AT P15, P14, P12

    
    
PROJECT DESCRIPTION BOARD

    
 
    
LOCATIONP15-PILE P-2BORING

    
    
CHISEL WELDING NEAR P14

    
    
BORING P12-PILE P2

    
 
    
BORING P12-PILE P2.

    
    
BENTONITE TANK P14

    
    
SOIL TESTING NEAR RP-2

    
 
 
 

 

 

 

 

 

 

 

Untitled Document