Road to Prosperity
Site last updated on:  12-12-2020 | You are visitor: 7887872
Completed Projects Projects Under Construction Citizen Services Careers Right to Service


Prevoius Weekly Reports

   01.04.2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

No of days remaing for completion as per the weekly plan

Remarks

1

PILE CAP RAILWAY SPAN

4

0

4

1

1

0

2

1

 

 

2

PIER CALICUT  SIDE

10

10

0

0

0

0

0

0

 

 

3

PIER NH SIDE

11

11

0

0

0

0

0

0

 

 

4

PIER RAILWAY SPAN

4

0

4

0

0

0

0

0

 

 

5

PIER CAP RAILWAY SPAN

4

0

4

0

0

0

0

0

 

 

6

RE/R WALL CALICUT  SIDE

100%

0.00%

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

7

RE/R WALL NH SIDE

100%

3.00%

97%

0

0.00%

2.00%

0.00%

0.00%

 

 

8

BEAM/SLAB  Staging CALICUT  SIDE

10

0

10

0

0

0.9

0

1

 

AP1-P1

9

BEAM/SLAB  Bar bending and Fixing CALICUT  SIDE

10

0

10

0

0

1

0

1

 

AP1-P1

10

BEAM/SLAB  Shuttering  and Concreting  Calicut SIDE

10

0

10

0

0

0

0

o

 

 

11

BEAM/SLAB  Staging NH SIDE

11

1

10

5

0

0.9

0

1

 

AP2-P19

12

BEAM/SLAB  Bar bending and Fixing NH  SIDE

11

1

10

4

0

1

0

1

 

AP2-P19

13

BEAM/SLAB  Shuttering  and Concreting  NH  SIDE

11

0

11

1

0

1

0

1

 

AP2-P19

14

BEAM/SLAB CALICUT  SIDE

10

0

10

0

0

0

0

0

 

 

15

BEAM/SLAB NH SIDE

11

0

11

0

0

1

0

0

 

 

16

BEAM/SLAB RAILWAY SPAN

3

0

3

0

0

0

0

0

 

 

17

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

18

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

19

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

20

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 

 

Availbility of Men

 

 

 

 

 

 

 

Date

26.03.11

27.03.11

28.03.11

29.03.11

30.03.11

31.03.11

01.04.11

No of labours

50

31

42

37

53

54

54

 

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

 

Material

Required

Available

 

 

 

 

 

Coarse Aggreagate (m3)

60

150

 

 

 

 

 

Fine Aggreagate(m3)

45

120

 

 

 

 

 

Cement(bag)

550

1015

 

 

 

 

 

Steel(MT)

8

165

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

 

 

Utilities to be shifted

Status

Remarks

 

 

 

 

 

BSNL

nil

 

 

 

 

 

 

KSEB

nil

 

 

 

 

 

 

KWA

nil

 

 

 

 

 

 

Others

nil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
Back
 
    
AP1 P1 STAGING (01.04.2011)

    
    
AP2-P19 STAGING (01.04.2011)

    
    
EXCAVATION FOR RETAINING WALL(01.04.2011)

    
    
KERB SHUTTERING (01.04.2011)

    
 
    
RE PANNEL CASTING(01.04.2011)

    
    
P18-19 SLAB CONCRETING(29.03.2011)

    
    
P18-P19 SLAB WORK IN PROGRESS (28.03.2011)

    
 
    
P14-PIERCAP CONCRETING (27.03.2011)

      
 

 

 

 

 

 

 

 