   25.03.2011
    

 

Si No

Activity Description

Total Quantity

Cumulative progress uptolast week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

1

PIER CAP PALAKKAD SIDE

1

0

1

1

1

1

0

0

 

2

PIER CAP MOYAN SCHOOL SIDE

3

3

0

1

1

1

0

0

 

3

RE/R WALL PALAKKAD  SIDE

100%

40

60

0

0.00%

5.00%

0.00%

5.00%

 

4

RE/R WALL MOYAN SCHOOL SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

5

BEAM/SLAB  Staging  PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

6

BEAM/SLAB  Bar bending and Fixing PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

7

BEAM/SLAB  Bar Shuttering AndConcreting PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

8

BEAM/SLAB  Staging MOYAN SCHOOL SIDE

4

1

3

0

0

1

0

1

 

9

BEAM/SLAB  Bar bending And Fixing MOYAN SCHOOL SIDE

4

1

3

0

0

1

0

1

 

10

BEAM/SLAB  Shuttering and Concreting MOYAN SCHOOL SIDE

4

1

3

0

0

1

0

0

 

11

BEAM/SLAB RAILWAY SPAN

7

0

7

0

0

0

1

0

 

12

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

13

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

14

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

15

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 

Availbility of Men

 

 

 

 

 

Date

19-03-'11

21-03-'11

22-03-'11

23-03-'11

24-03-'11

25-03-'11

Nof labours

55

52

54

54

55

55

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

Required

Available

Remarks

 

 

 

Fine aggregate {m³}

 

 

 

 

 

 

Cement(bag)

 

760

 

 

 

 

Steel inT

 

90

 

 

 

 

Coarse Aggreagate (m3)

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

Utilities to be shifted

 

Remarks

 

 

 

 

BSNL

 

 

 

 

 

 

KSEB

 

 

 

 

 

 

KWA

 

progress

 

 

 

 

Others

 

 

 

 

 

 

 
Back
 
    
CONCRETING OF P5-P6 SLAB (25.03.2011)

    
    
EXCAVATION OF RETAINING WALL (25.03.2011)

    
    
WELDING WORKS OF BOWSTRING STAGING(25.03.2011)

    
    
P5 & P6 DECK SLAB (24.03.2011)

    
 
    
EXCAVATION OF RETAINING WALL(24.03.2011)

    
    
CONCRETE WORK P5-P6 SLAB (25.03.2011)

    
    
CASTING OF RETAINING WALL (24.03.2011)

    
 
    
BOWSTRING SAGING ERECTION(24.03.2011)

    
    
P5-P6 DECK SLAB BARBENDING(23.03.2011)

    
    
SHUTTERING OF RETAINING WALL (22.03.2011)

    
 
    
BOWSTRING STAGING USING CRANE(21.03.2011)

    
    
BARBENDING WORKS OF RETAINING WALL(19.03.2011)

    
    
BARBENDING WORKS OF GIRDER P5 & P6(19.03.2011)

    
 
    
BACKFILLING OF RETAINING WALL (19.03.2011)

      
 

 

 

 

 

 

 

 