   Weekly Progress Report - 30.11.2020 to 05.12.2020
    
Weekly Progress Report - 30.11.2020 to 05.12.2020
30.11.2020 01.12.2020 02.12.2020 03.12.2020 04.12.2020 05.12.2020
Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF).
Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) Slab Concrete at 0.00m level at Zone A,(Academic Building) Form-work preparation/installation for slab at 5.10m level at Zone B. Form-work preparation/installation for slab at 5.10m level at Zone B. Form-work preparation/installation for slab at 5.10m level at Zone B.
Reinforcement installation for First floor Columns  (Engg. Building) Reinforcement installation for First floor Columns  (Engg. Building) Shuttering works / Reinforcement installation for First floor Columns  (Engg. Building) Shuttering works / Reinforcement installation for First floor Columns  (Engg. Building) Shuttering works / Reinforcement installation for First floor Columns  (Engg. Building)
Shuttering works / Reinforcement installation for First floor Columns  (Engg. Building)
Soil Backfilling inside Plinth. (International Guest House) Soil Backfilling inside Plinth. (International Guest House) Reinforcement installation for Drain at Strech 1-2. and  Rcc Pouring for the Base Slab of  Drain at Strech 1-2 (Chainage 278-222.4).
 (Campus Rejuvanation) 
Reinforcement installation for Drain at Strech 1-2. and  Rcc Pouring for the Base Slab of  Drain at Strech 1-2 (Chainage 278-222.4).
 (Campus Rejuvanation)
Reinforcement installation for Drain at Strech 1-2. and  Rcc Pouring for the Base Slab of  Drain at Strech 1-2 (Chainage 278-222.4).
 (Campus Rejuvanation)
Reinforcement installation for Drain at Strech 1-2. and  Rcc Pouring for the Base Slab of  Drain at Strech 1-2 (Chainage 278-222.4).
 (Campus Rejuvanation)
Reinforcement installation for Drain at Strech 1-2. (Campus Rejuvanation)  Reinforcement installation for Drain at Strech 1-2. (Campus Rejuvanation)  Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1)
 
Back
 
    
EXCAVATION

    
    
REINFORCEMENT WORK

    
    
REINFORCEMENT WORK

    
    
CONCRETE WORK

    
 
    
DRAINAGE WORK

    
    
REINFORCEMENT WORK

    
    
REINFORCEMENT WORK

    
 
    
REINFORCEMENT CUTTING AND BENDING

    
    
REINFORCEMENT WORK

    
    
REINFORCEMENT WORK

    
 
    
BACKFILLING

    
    
DRAINAGE WORK

    
    
FORMWORK INSTALLATION

    
 
    
REINFORCEMENT WORK

    
    
FORMWORK INSTALLATION

      
 

 

 

 

 

 

 

 