Weekly Progress Report - 30.11.2020 to 05.12.2020 |
30.11.2020 |
01.12.2020 |
02.12.2020 |
03.12.2020 |
04.12.2020 |
05.12.2020 |
Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). |
Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). |
Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). |
Shuttering works/Reinforcement installation for Columns, Lift wall at Zone A, Zone B (GF-FF). |
Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) |
Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) |
Slab Concrete at 0.00m level at Zone A,(Academic Building) |
Form-work preparation/installation for slab at 5.10m level at Zone B. |
Form-work preparation/installation for slab at 5.10m level at Zone B. |
Form-work preparation/installation for slab at 5.10m level at Zone B. |
Reinforcement installation for First floor Columns (Engg. Building) |
Reinforcement installation for First floor Columns (Engg. Building) |
Shuttering works / Reinforcement installation for First floor Columns (Engg. Building) |
Shuttering works / Reinforcement installation for First floor Columns (Engg. Building) |
Shuttering works / Reinforcement installation for First floor Columns (Engg. Building) |
Shuttering works / Reinforcement installation for First floor Columns (Engg. Building)
|
Soil Backfilling inside Plinth. (International Guest House) |
Soil Backfilling inside Plinth. (International Guest House) |
Reinforcement installation for Drain at Strech 1-2. and Rcc Pouring for the Base Slab of Drain at Strech 1-2 (Chainage 278-222.4).
(Campus Rejuvanation) |
Reinforcement installation for Drain at Strech 1-2. and Rcc Pouring for the Base Slab of Drain at Strech 1-2 (Chainage 278-222.4).
(Campus Rejuvanation) |
Reinforcement installation for Drain at Strech 1-2. and Rcc Pouring for the Base Slab of Drain at Strech 1-2 (Chainage 278-222.4).
(Campus Rejuvanation) |
Reinforcement installation for Drain at Strech 1-2. and Rcc Pouring for the Base Slab of Drain at Strech 1-2 (Chainage 278-222.4).
(Campus Rejuvanation) |
Reinforcement installation for Drain at Strech 1-2. (Campus Rejuvanation) |
Reinforcement installation for Drain at Strech 1-2. (Campus Rejuvanation) |
Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) |
Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) |
Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) |
Excavation for Drain, Trench at Stretch 3-4 (infront of Substation 1) |