Weekly Progress Report - 23.11.2020 to 28.11.2020 |
23.11.2020 |
24.11.2020 |
25.11.2020 |
26.11.2020 |
27.11.2020 |
28.11.2020 |
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building)
|
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Form-work preparation/ installation for slab at 0.00m level at Zone A (Grid B-F/1-6),5.1m level at zone B.
|
Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) |
Cutting and bending of reinforcement for the slab,beams and columns. (Academic Building) |
Cutting and bending of reinforcement for the slab,beams and columns. (Academic Building) |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Soil Backfilling inside Plinth. (International Guest House) |
Soil Backfilling inside Plinth. (International Guest House) |
Reinforcement installation for Ground floor Columns at Zone A.(Academic Building) |
Reinforcement installation for Ground floor Columns at Zone A.(Academic Building) |
Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) |
Slab Concrete. (+3.15m Lvl). (Engg. Building) |
Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) |
Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) |
Setting out for the drain.(Campus Rejuvanation Work) |
Setting out for the drain.(Campus Rejuvanation Work) |
Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) |
Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) |
Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) |
Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) |
Excavation for foundation. (faccilitation centre) |
Excavation for foundation. (faccilitation centre) |
Excavation for foundation. (faccilitation centre) |
Excavation for foundation. (faccilitation centre) |
Excavation for foundation. (faccilitation centre) |
Excavation for foundation. (faccilitation centre) |