   Weekly Progress Report - 23.11.2020 to 28.11.2020
    
Weekly Progress Report - 23.11.2020 to 28.11.2020
23.11.2020 24.11.2020 25.11.2020 26.11.2020 27.11.2020 28.11.2020
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building)
Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building) Form-work preparation /installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building)
Form-work preparation/ installation for slab at 0.00m level at Zone A (Grid B-F/1-6),5.1m level at zone B.
Form-work preparation/ installation for slab at 0.00m level at Zone A, 5.1m level at zone B. (Academic Building)
Cutting and bending of reinforcement for the slab,beams and columns. (Academic Building) Cutting and bending of reinforcement for the slab,beams and columns. (Academic Building)  Cutting and bending of reinforcement for the slab,beams and columns.  Cutting and bending of reinforcement for the slab,beams and columns.  Soil Backfilling inside Plinth. (International Guest House) Soil Backfilling inside Plinth. (International Guest House)
Reinforcement installation for Ground floor Columns  at Zone A.(Academic Building) Reinforcement installation for Ground floor Columns  at Zone A.(Academic Building) Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) Slab Concrete. (+3.15m Lvl). (Engg. Building) Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building) Shuttering Works/ Reinforcement installation for Ground floor Columns at Zone B.(Academic Building)
 Setting out for the drain.(Campus Rejuvanation Work) Setting out for the drain.(Campus Rejuvanation Work) Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work) Excavation for Drain & Trench in front of Amenity centre (Span 3-4)(Campus Rejuvanation Work)
Excavation for foundation. (faccilitation centre) Excavation for foundation. (faccilitation centre) Excavation for foundation. (faccilitation centre) Excavation for foundation. (faccilitation centre) Excavation for foundation. (faccilitation centre) Excavation for foundation. (faccilitation centre)
 
Back
 
    

    
    
EXCAVATION WORK

    
    
PLINTH WORK

    
    
REINFORCEMENT CUTTING AND BENDING

    
 
    
EARTHWORK

    
    
REINFORCEMENT WORK

    
    
CONCRETED SLAB

    
 
    
EXCAVATION

    
    
BACKFILLING

    
    
SETTING OUT FOR THE DRAIN

    
 
    
FORMWORK INSTALLATION

    
    
REINFORCEMENT WORK

      
 

 

 

 

 

 

 

 