   Weekly Progress Report - 16.11.2020 to 21.11.2020
    
Weekly Progress Report - 16.11.2020 to 21.11.2020
16.11.2020 17.11.2020 18.11.2020 19.11.2020 20.11.2020 21.11.2020
Painting work (Yellow and black colour) progressing at Crash barrier (inside area).
Painting and primer coating work at light post.
Painting work (Yellow and black colour) progressing at Crash barrier (inside area).
Painting and primer coating work at light post
Painting work (Yellow and black colour) progressing at Crash barrier (inside area). Second coat painting work (Yellow and black colour) progressing at Crash barrier (inside area). Painting work at electric pole.  Second coat painting work (Yellow and black colour) progressing at Crash barrier (inside area). Painting work starts at electric pole. Grinding work on central median for painting.
Second coat painting work (Yellow and black colour) progressing at Crash barrier (inside area). Painting work starts at electric pole. Grinding work starts on central median for painting. 
Kerb stone fixing work at Under passage (P12-P13 - sides). Kerb stone fixing work at Under passage (P12-P13 - sides). Reinforcement, Shuttering work at Slip road area (Crown plaza side). Reinforcement, Shuttering work  at Slip road area (Crown plaza side). Slab casting work for drain chamber infront of Le meridian starts. Reinforcement, Shuttering work at Slip road area (Crown plaza side). 
Reinforcement, Shuttering work starts at Slip road area (Crown plaza side).  
 
Reinforcement work at Slip road area (Crown plaza side). Reinforcement, Shuttering work at Slip road area (Crown plaza side). Cleaning work at bridge portion. Cleaning work for road tarring (Patch work) at infront of Crown plaza. Cleaning work for BC at service Road ( infront of Crown plaza) .
Cleaning work starts for BC at near empire plaza hotel. 
 
  Cleaning work at bridge portion. Errection of Electric Light Posts Electric pole fixing. Kerb stone fixing work at P11-P12 LHS (Infront of Cool homes) Kerb stone fixing work starts at P11-P12 LHS (Infront of Cool homes)
  Installation of Direction sign boards.   Kerb stone fixing work at P11-P12 LHS (Infront of Cool homes) BC work at service Road ( infront of Crown plaza) .  
 
Back
 
    
DRAINAGE WORK

    
    
PAINTING

    
    
PAINTING

    
    
ERECTION OF ELECTRIC LIGHT POSTS

    
 
    
ERECTION OF ELECTRIC LIGHT POSTS

    
    
CLEANING

    
    
PAINTING

    
 
    
PAINTING

    
    
DRAINAGE WORK

    
    
UNDER PASSAGE WORK

    
 
    

    
    

    
    
PAINTING

    
 
    
PAINTING

    
    
DRAINAGE WORK

    
    
UNDER PASSAGE WORK

    
 
 
 

 

 

 

 

 

 

 