Weekly Progress Report - 02.11.2020 to 07.11.2020 |
02.11.2020 |
03.11.2020 |
04.11.2020 |
05.11.2020 |
06.11.2020 |
07.11.2020 |
Electrical switch fixing at 6th floor. |
Electrical work.
|
Aluminum duct Louvre works. |
Aluminum duct Louvre works. |
SS work at ground floor main stair. |
HVAC duct making work. |
Ceiling painting at 4th floor. |
Stair ceiling painting |
SS handrail work at ground floor main stair. |
SS handrail work at ground floor main stair. |
Fire duct work. |
External painting. |
Aluminum work. |
Aluminum duct Louvre works. |
Electrical cable tray work. |
Electrical cable tray work. |
West side painting. |
Aluminum Louvre work. |
|
HVAC duct work |
|
|
Electrical switch fixing. |
Fire pipe laying at terrace floor. |
|
|
|
|
Aluminum Louvre work. |
Grill ventilation works. |