   Weekly Progress Report - 26.10.2020 to 31.10.2020
    
Weekly Progress Report - 26.10.2020 to 31.10.2020
26.10.2020 27.10.2020 28.10.2020 29.10.2020 30.10.2020 31.10.2020
.Tile work at 2nd floor Electrical switch fixing at 7th floor. Plastering work at 1st floor gents toilet. Aluminum duct Louvre works. Aluminium Work Plumbing work
Painting work. Block work at 1st floor gents toilet. Aluminum duct Louvre works .Pcc foundation work for HVAC at terrace floor. Grill Work Aluminium Work
Aluminum window work. Aluminum window work. Interior painting work. Plumbing concealed work at 1st floor gents toilet. Interior painting work. Interior painting work.
    Electrical cable tray work at ground floor   Plumbing work  
           
 