Weekly Progress Report - 26.10.2020 to 31.10.2020 |
26.10.2020 |
27.10.2020 |
28.10.2020 |
29.10.2020 |
30.10.2020 |
31.10.2020 |
.Tile work at 2nd floor |
Electrical switch fixing at 7th floor. |
Plastering work at 1st floor gents toilet. |
Aluminum duct Louvre works. |
Aluminium Work |
Plumbing work |
Painting work. |
Block work at 1st floor gents toilet. |
Aluminum duct Louvre works |
.Pcc foundation work for HVAC at terrace floor. |
Grill Work |
Aluminium Work |
Aluminum window work. |
Aluminum window work. |
Interior painting work. |
Plumbing concealed work at 1st floor gents toilet. |
Interior painting work. |
Interior painting work. |
|
|
Electrical cable tray work at ground floor |
|
Plumbing work |
|
|
|
|
|
|
|