   Weekly Progress Report - 26.10.2020 to 31.10.2020
    
Weekly Progress Report - 26.10.2020 to 31.10.2020
26.10.2020 27.10.2020 28.10.2020 29.10.2020 30.10.2020 31.10.2020
Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block) Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block) Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block) Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block) Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block) Form-work preparation/ installation for slab at 0.00m level at Zone A.  (Academic Block)
Cutting and bending of reinforcement for the slab,beams and columns. Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building) Cutting and bending of reinforcement for the slab,beams and columns. Cutting and bending of reinforcement for the slab,beams and columns. Cutting and bending of reinforcement for the slab,beams and columns. Cutting and bending of reinforcement for the slab,beams and columns.
Excavation works for the  R E wall.(Academic Block) Cutting and bending of reinforcement for the slab,beams and columns. Excavation works for the  R E wall.(Academic Block) Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building)
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) Excavation works for the  R E wall.(Academic Block) Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building)      
 