Weekly Progress Report - 19.10.2020 to 24.10.2020 |
19.10.2020 |
20.10.2020 |
21.10.2020 |
22.10.2020 |
23.10.2020 |
24.10.2020 |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation /installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation /installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Excavation works for the R E wall.(Academic Block) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Excavation works for the R E wall.(Academic Block) |
Excavation works for the R E wall.(Academic Block) |
Excavation works for the R E wall.(Academic Block) |
Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building) |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Form-work preparation /installation for slab (+3.15m Lvl). (Engg Building) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building) |
Excavation works for the R E wall.(Academic Block) |
Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building) |
Excavation works for the R E wall.(Academic Block) |