   Weekly Progress Report - 19.10.2020 to 24.10.2020
    
Weekly Progress Report - 19.10.2020 to 24.10.2020
19.10.2020 20.10.2020 21.10.2020 22.10.2020 23.10.2020 24.10.2020
Aluminium work at yard. Aluminium work at yard. Aluminium work at yard. Aluminium work Painting work at rooms Plumbing work at duct.
SS handrail work. Fire safety work. Fire safety work. Painting work at passage. Aluminium work Fire work at duct
Stair side plastering. SS handrail work. SS handrail work. Grill fabrication work. Electrical work at 3rd floor. Aluminum duct door work
    Grill Painting Tile flooring at balcony.    
           
 
Back
 
    
PLUMBING WORK

    
    
FIRE DUCT WORK

    
    
ALUMINUM WORK

    
    
ALUMINUM WORK

    
 
    
PAINTING WORK

    
    
ELECTRICAL WORK

    
    
PAINTING WORK

    
 
    
TILE WORK

    
    
GRILL FABRICATION WORK

    
    
ALUMINUM WORK

    
 
    
WATERPROOFING

    
    
TILING WORK

    
    
PAINTING

    
 
    
ALUMINIUM WORK

    
    
PAINTING

    
    
GRILL WORK

    
 
    
ALUMINIUM WORK

    
    
TILE FLOORING.

    
    
PLUMBING WORK

    
 
    
LIFT SIDE PAINTING

    
    
ALUMINIUM

      
 

 

 

 

 

 

 

 