Weekly Progress Report - 05.10.2020 to 10.10.2020 |
05.10.2020 |
06.10.2020 |
07.10.2020 |
08.10.2020 |
09.10.2020 |
10.10.2020 |
Fire alarm work. |
Granite work |
Granite work |
Aluminium work at yard. |
Aluminium work at yard. |
Aluminium work at yard. |
SS handrail work at fire stair. |
ceiling painting. |
ceiling painting. |
Stair side plastering. |
Stair side plastering. |
Stair side plastering. |
Aluminum fabrication work at yard. |
Window grill fabrication. |
Window grill fabrication. |
Fire safety work. |
Fire safety work. |
Fire safety work. |
|
Aluminum fabrication work at yard. |
Aluminum fabrication work at yard. |
SS handrail work. |
SS handrail work. |
SS handrail work. |
|
Fire work at 2nd floor. |
Fire work at 2nd floor. |
|
|
|