Weekly Progress Report - 05.10.2020 to 10.10.2020 |
05.10.2020 |
06.10.2020 |
07.10.2020 |
08.10.2020 |
09.10.2020 |
10.10.2020 |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Rebar installation for columns.(Int. Guest House ) |
Rebar installation for columns.(Int. Guest House ) |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Rebar installation for columns and Lift at Zone A.(Academic Block) |
Rebar installation for columns and Lift at Zone B.(Academic Block) |
Rebar installation for columns and Lift at Zone A.(Academic Block) |
Rebar installation for columns and Lift at Zone A.(Academic Block) |
Rebar installation for columns at Zone A & B.(Academic Block) |
Rebar installation for columns at Zone A & B.(Academic Block) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation /installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Form-work preparation/ installation for slab (+3.15m Lvl).(Engg Building) |
Soil Backfilling/Levelling inside Plinth Wall at Zone B.(Academic Block) |
Soil Backfilling/Levelling inside Plinth Wall at Zone B.(Academic Block) |
Soil Backfilling/Levelling inside Plinth Wall at Zone B.(Academic Block) |
Soil Backfilling/Levelling inside Plinth Wall at Zone B.(Academic Block) |
Concrete pouring for columns (Int. Guest House ) |
|