Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Form-work preparation/ installation for slab at 0.00m level at Zone A. (Academic Block) |
Cutting and bending of reinforcement for the slab,beams and columns |
Cutting and bending of reinforcement for the slab,beams and columns |
Cutting and bending of reinforcement for the slab,beams and columns |
Concrete pouring for Slab at -2.70m level at Zone A.(Grid A-D/1-5) (Academic Block) |
Rebar installation for columns.(Int. Guest House ) |
Rebar installation for columns.(Int. Guest House ) |
Concrete pouring for Columns (Engg Building & Int. Guest House ) |
Rebar installation for columns. (Int. Guest House ) |
Soil Backfilling /Levelling inside Plinth Wall at Zone B.(Academic Block) |
Cutting and bending of reinforcement for the slab,beams and columns |
Soil Backfilling/ Levelling inside Plinth Wall at Zone B.(Academic Block) |
Soil Backfilling/ Levelling inside Plinth Wall at Zone B.(Academic Block) |
Rebar installation for columns. (Int. Guest House ) |
|
Rebar installation for columns.(Int. Guest House ) |
Soil Backfilling/Levelling inside Plinth Wall at Zone B.(Academic Block) |
Cutting and bending of reinforcement for the slab,beams and columns. |
Cutting and bending of reinforcement for the slab,beams and columns. |
Concrete pouring for Columns at Zone A (UGF - GF). (Academic Block) |
|
|
Rebar installation for columns.(Int. Guest House ) |
|
|