Prevoius Weekly Reports

   Weekly Progress Report - 28.09.2020 to 03.10.2020
    
Weekly Progress Report - 28.09.2020 to 03.10.2020
28.09.2020 29.09.2020 30.09.2020 01.10.2020 02.10.2020 03.10.2020
Grill fabrication Aluminum work. Electrical work at 3rd floor Window grill work Plumbing work at duct Tile work at 5th floor.
Electrical work at 5th floor. Grill painting Ceiling painting at 4th floor. Granite work at 5th floor. Aluminum fabrication work. Window grill painting.
Aluminum window fixing.   Window grill painting. Window grill painting. External painting at West side. Aluminum fabrication work at yard.
HVAC work   Aluminum work. Aluminum work. Window grill fabrication work. Window grill fabrication. 4.
    Plumbing work at duct.   Fire alarm works.  
 
Back
 
    
WINDOW GRILL FABRICATION WORK

    
    
TILE WORK

    
    
GRILL PAINTING

    
    
ALUMINUM FABRICATION WORK

    
 
    
PAINTING WORK

    
    
FIRE SAFETY WORK

    
    
PLUMBING WORK

    
 
    
ALUMINUM FABRICATION WORK

    
    
GRILL FABRICATION WORK

    
    
GRANITE WORK

    
 
    
GRILL PAINTING

    
    
PLUMBING WORK

    
    
GRILL FABRICATION WORK

    
 
    
ELECTRICAL WORK

    
    
PAINTING

    
    
ALUMINUM FABRICATION WORK

    
 
    
GRILL PAINTING

    
    
ALUMINUM WORK

    
    
HVAC

    
 
    
ELECTRICAL WORK

    
    
ALUMINUM FABRICATION WORK

      
 

 

 

 

 

 

 

 