Prevoius Weekly Reports

   04.03.2011
    

 

 

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

1

PIER CAP PALAKKAD SIDE

1

0

1

1

1

1

0

0

 

2

PIER CAP MOYAN SCHOOL SIDE

3

3

0

1

1

1

0

0

 

3

RE/R WALL PALAKKAD  SIDE

100%

35%

65%

0

0.00%

5.00%

0.00%

0.00%

 

4

RE/R WALL MOYAN SCHOOL SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

5

BEAM/SLAB  Staging  PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

6

BEAM/SLAB  Bar bending and Fixing PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

7

BEAM/SLAB  Bar Shuttering AndConcreting PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

8

BEAM/SLAB  Staging MOYAN SCHOOL SIDE

4

1

4

0

0

0

1

1

 

9

BEAM/SLAB  Bar bending And Fixing MOYAN SCHOOL SIDE

4

1

4

0

0

0

1

1

 

10

BEAM/SLAB  Shuttering and Concreting MOYAN SCHOOL SIDE

4

0

4

0

0

0

1

1

 

11

BEAM/SLAB RAILWAY SPAN

7

0

7

0

0

0

1

0

 

12

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

13

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

14

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

15

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Availbility of Men

 

 

 

 

 

 

 

 

 

Date

26-2-'11

27-2-'11

 

28-2-'11

1/3/2011

 

2-3-2-'11

3/3/2011

 

 

Nof labours

65

65

 

65

67

 

70

70

 

 

 

 

 

 

 

 

 

 

 

 

 

Material Stocking Status

 

 

 

 

 

 

 

 

 

Required

Available

Remarks

 

 

 

 

 

 

 

Fine aggregate {m³}

 

 

 

 

 

 

 

 

 

 

Cement(bag)

300

500

 

 

 

 

 

 

 

 

Steel inT

6.5

125

 

 

 

 

 

 

 

 

Coarse Aggreagate (m3)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Utility shifting

 

 

 

 

 

 

 

 

 

Utilities to be shifted

 

Remarks

 

 

 

 

 

 

 

 

BSNL

 

 

 

 

 

 

 

 

 

 

KSEB

Done

 

 

 

 

 

 

 

 

 

KWA

 

 

 

 

 

 

 

 

 

 
Back
 
    
SHUTTERING WORKS (03.03.2011)

    
    
SHUTTERING OF RE WALL (03.03.2011)

    
    
PCC FOR RE WALL (03.03.2011)

    
    
MATERIALS AT SITE(03.03.2011)

    
 
    
GIRDER SHUTTERING WORKS (03.03.2011)

    
    
BOWSTRING STAGING WORKS (03.03.2011)

      
 

 

 

 

 

 

 

 