Weekly Progress Report - 21.09.2020 to 26.09.2020 |
21.09.2020 |
22.09.2020 |
23.09.2020 |
24.09.2020 |
25.09.2020 |
26.09.2020 |
Aluminum work. |
Plumbing work at 3rd floor gents toilet. |
Plumbing work at duct |
Grill painting |
Fire alarm work at 4th floor |
Plumbing work at 3rd floor grants toilet |
Fire alarm works. |
Electrical work at first floor. |
Grill painting |
Plumbing work at duct |
Granite flooring |
Grill fabrication |
Granite skirting work at fire stair. |
HVAC work |
Aluminum work |
Tile flooring at 1st floor |
Grill fabrication work. |
Electrical work at 5th floor. |
HVAC works. |
Aluminum window frame fixing. |
Grill fabrication work. |
Aluminum work |
Aluminum work |
Grill painting |
|
|
|
Plumbing work at duct J7 |
Electrical work at 5th floor gent's toilet. |
|