   Weekly Progress Report - 14.09.2020 to 19.09.2020
    
Weekly Progress Report - 14.09.2020 to 19.09.2020
14.09.2020 15.09.2020 16.09.2020 17.09.2020 18.09.2020 19.09.2020
Aluminum fabrication work at yard. Aluminum work. Hvac work started. Aluminum fabrication work at yard. Grill works at yard. Aluminum fabrication work at yard
Grill works at yard.
Grill  works at yard.
Aluminum fabrication work & Grill  works at yard.
Grill works at yard. Electrical work under progress. Hvac material shifting.
Electrical work under progress.
Plumbing work at duct.
Granite flooring at 1st floor fire stair.
Plumbing work at duct. Granite flooring at 1st floor fire stair. Grill  works at yard.
Sunken concreting at 2nd floor gents toilet.
 
Fire work at 1st floor. Electrical work under at 4th floor.
Granite flooring at 1st floor fire stair. Plumbing work at duct. Granite flooring at 1st floor fire stair
   
 7. Screeding concrete at terrace.
    Plumbing work at duct.
 
Back
 
    
GRILL FABRICATION WORK

    
    
PLUMBING WORK

    
    
HVAC

    
    
GRANITE FLOORING WORK

    
 
    
ALUMINUM WORK

    
    
SCREEDING

    
    
HVAC

    
 
    
GRILL FABRICATION WORK

    
    
GRANITE WORK

    
    
FIRE SAFETY WORK

    
 
    
ELECTRICAL WORK

    
    
ALUMINUM WORK

    
    
SUNKEN FILLING

    
 
    
ALUMINUM FABRICATION WORK

    
    
ELECTRICAL WORK

    
    
GRILL FABRICATION WORK

    
 
 
 

 

 

 

 

 

 

 

Untitled Document