   Weekly Progress Report - 24.08.2020 to 29.08.2020
    

                                                                                                                                       

Weekly Progress Report - 24.08.2020 to 29.08.2020

24.08.2020

25.08.2020

26.08.2020

27.08.2020

28.08.2020

29.08.2020

Solid Block Masonry & Plastering work for Plinth walls at Zone B
in Academic Building.

Solid Block Masonry & Plastering work for Plinth walls at Zone B in Academic Building.

Concrete Pouring for Lift shaft wall & Retaining walls at Grid F in Academic Building.

Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building.

Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building

Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building

Shuttering work for Lift wall & Retaining walls at Grid F in Academic Building.

Reinforcement tying for column at zone A (Upper ground Floor) in Academic Building.

Reinforcement installations for columns at zone A (Upper ground Floor) in Academic Building.

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.

Form-work preparation/installation for remaining part of slab at -2.70m level, Zone A in Academic Building

Form-work preparation/installation for remaining part of slab at -2.70m level, Zone A in Academic Building

Reinforcement tying for column at zone A (Upper ground Floor) in Academic Building.

Formwork preparation/installation for slab at -2.70m level at Zone A in Academic Building.

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.

Solid Block Masonry work for Plinth walls in Engineering Block.

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.

Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.

Concrete Pouring for Stairs,Columns (2nd lift) in Engineering Block.

  Solid Block Masonry work for Plinth walls in Engineering Block Solid Block Masonry work for Plinth walls in Engineering Block
    Concrete Pouring for Columns (First lift) in International Guest House Building.      
 
Back
 
    
FORMWORK INSTALLATION

    
    
REINFORCEMENT WORK

    
    
REINFORCEMENT BENDING WORK

    
    
REINFORCEMENT WORK FOR COLUMN

    
 
    
DE SHUTTERING WORK

    
    
REINFORCEMENT WORK FOR COLUMN

    
    
BRICKWORK FOR PLINTH

    
 
    
SHUTTERING WORK FOR COLUMN

    
    
CONCRETE WORK FOR COLUMN

    
    
CONCRETE WORK

    
 
    
CONCRETE WORK

    
    
CONCRETE WORK

    
    
BRICKWORK FOR PLINTH

    
 
    
FORMWORK INSTALLATION WORK

    
    
REINFORCEMENT BENDING WORK

    
    
REINFORCEMENT WORK FOR COLUMN

    
 
    
BRICKWORK FOR PLINTH

    
    
REINFORCEMENT WORK FOR COLUMN

    
    
SHUTTERING WORK

    
 
    
SHUTTERING WORK

      
 

 

 

 

 

 

 

 