Weekly Progress Report - 24.08.2020 to 29.08.2020
|
24.08.2020
|
25.08.2020
|
26.08.2020
|
27.08.2020
|
28.08.2020
|
29.08.2020
|
Solid Block Masonry & Plastering work for Plinth walls at Zone B
in Academic Building.
|
Solid Block Masonry & Plastering work for Plinth walls at Zone B in Academic Building.
|
Concrete Pouring for Lift shaft wall & Retaining walls at Grid F in Academic Building.
|
Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building.
|
Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building
|
Reinforcement installation & Shuttering works for Columns at Zone A (UGF) in Academic Building
|
Shuttering work for Lift wall & Retaining walls at Grid F in Academic Building.
|
Reinforcement tying for column at zone A (Upper ground Floor) in Academic Building.
|
Reinforcement installations for columns at zone A (Upper ground Floor) in Academic Building.
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.
|
Form-work preparation/installation for remaining part of slab at -2.70m level, Zone A in Academic Building
|
Form-work preparation/installation for remaining part of slab at -2.70m level, Zone A in Academic Building
|
Reinforcement tying for column at zone A (Upper ground Floor) in Academic Building.
|
Formwork preparation/installation for slab at -2.70m level at Zone A in Academic Building.
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.
|
Solid Block Masonry work for Plinth walls in Engineering Block.
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.
|
Cutting and bending of reinforcement for the slab,beams and columns in Academic Building.
|
Concrete Pouring for Stairs,Columns (2nd lift) in Engineering Block.
|
|
Solid Block Masonry work for Plinth walls in Engineering Block |
Solid Block Masonry work for Plinth walls in Engineering Block |
|
|
Concrete Pouring for Columns (First lift) in International Guest House Building. |
|
|
|