Weekly Progress Report - 10.08.2020 to 15.08.2020
|
10.08.2020
|
11.08.2020
|
12.08.2020
|
13.08.2020
|
14.08.2020
|
15.08.2020
|
Plastering work for Plinth walls at Zone B in Academic Block
|
Plastering work for Plinth walls at Zone B in Academic Block
|
Plastering work for Plinth walls at Zone B in Academic Block
|
Plastering work for Plinth walls at Zone B in Academic Block
|
Plastering work for Plinth walls at Zone B in Academic Block
|
No work at site
|
Cutting and bending of reinforcement for the slab,beams and columns
|
Form-work preparation/installation for the slab at -2.70m level at Zone A in Academic Block
|
Form-work preparation/installation for the slab at -2.70m level at Zone A in Academic Block
|
Form-work preparation/installation for the slab at -2.70m level at Zone A in Academic Block
|
Form-work preparation/installation for the slab at -2.70m level at Zone A in Academic Block
|
|
Shuttering work for stairs in Engineering Dept. Block
|
Cutting and bending of reinforcement for the slab,beams and columns
|
Cutting and bending of reinforcement for the slab,beams and columns
|
Reinforcement tying for lift wall at Zone A, Retaining wall at Grid F.
|
Reinforcement tying for lift wall at Zone A, Retaining wall at Grid F.
|
|
|
Shuttering work for stairs in Engineering Dept. Block
|
Shuttering work for stairs in Engineering Dept. Block
|
Cutting and bending of reinforcement for the slab,beams and columns
|
Shuttering work for stairs in Engineering Dept. Block
|
|
|
|
|
Shuttering work for stairs in Engineering Dept. Block
|
Reinforcement installation for columns in International Guest House Block
|
|