PREPERATION FOR SLAB CONCRETE
|
| | |
REINFORCEMENT CUTTING AND BENDING
|
| | |
REINDFORCEMENT TYING FOR SLAB
|
| | |
FORMWORK AND SHUTTERING FOR SLAB CONCRETING
|
| | |
|
FORM-WORK INSTALLATION FOR SLAB AT -2.70M LEVEL
|
| | |
INTERNATIONAL GUEST HOUSE BUILDING
|
| | |
FORM-WORK INSTALLATION FOR SLAB AT -2.70M LEVEL AT ZONE A
|
| | |
|
CONCRETE POURING FOR COLUMNS AT ENGINEERING BLOCK
|
| | |
CONCRETE POURING FOR COLUMNS AT ZONE B
|
| | |
CONCRETE POURING FOR STAIRCASE
|
| | |
|
SHUTTERING WORK FOR COLUMNS IN ZONE B
|
| | |
COLUMN SHUTTERING AT INTERNATIONAL GUEST HOUSE
|
| | |
REINFORCEMENT WORK FOR BEAMS AT -2.70M LEVEL AT ZONE A
|
| | |
|
SHUTTERING WORK FOR STAIRS AT ENGINEERING BLOCK
|
| | |
REINFORCEMENT CUTTING AND BENDING FOR THE SLAB, BEAMS AND COLUMNS
|
| | |
FORM WORK INSTALLATION
|
| | |
|
|
|