   Weekly Progress Report 29.06.2020 - 04.07.2020
    
Weekly Progress Report - 29.06.2020 to 04.07.2020
29.06.2020 30.06.2020 01.07.2020 02.07.2020 03.07.2020 04.07.2020
Elevator work at L3 machine room

Elevator work at L3 machine room

Elevator work at L3 machine room Elevator work at L3 

Elevator work at L3 

 

Elevator work at L3 
6th floor gents toilet work
Gents toilet block work at 6th floor. Plastering works at 1st and 3rd floor floor. Duct plastering works at 1st  floor  Plastering works at 2nd floor. Tile work at 2nd floor
Tile work at 3rd floor Tile work at 3rd floor. Tile work at 2nd floor. Tile work at 2nd floor  Tile work at 2nd floor  
           
       
 
 
 
Back
 
    
LIFT L3 MACHINE ROOM

    
    
TILE WORK 2ND FLOOR

    
    
TILE WORK AT 2ND FLOOR

    
    
ELEVATOR WORK AT L3

    
 
    
TILE WORK AT 2ND FLOOR

    
    
ELEVATOR WORK AT L3

    
    
ELEVATOR WORK AT L3

    
 
    
TILE WORK AT 2ND FLOOR

    
    
PLASTERING AT 3RD FLOOR

    
    
PLASTERING AT 1ST FLOOR

    
 
    
TILE WORK 3RD FLOOR

    
    
BLOCK WORK 6 TH FLOOR

    
    
ELEVATOR WORK

    
 
 
 

 

 

 

 

 

 

 