Progress Report For PalakkadSultanpetROB for the week ending on 25-02-2011

Si No

Activity Description

Total Quantity

Cumulative progress upto last week

Balance  work up to last week

Cumulative delay in Qty up to last week

Work  planned  during the week

Actual work done during the week

Cumulative delay in Qty up to this week

Work  Planned for next week

Remarks

 

PCC for RAFT MOYAN SIDE

1

1

0

0

0

0

0

0

 

2

PCC for RAFT PALAKKAD SCHOOL SIDE

3

3

0

0

0

0

0

0

 

4

RAFT PALAKKAD SIDE

3

3

0

0

0

0

0

0

 

5

RAFT MOYAN SCHOOL SIDE

1

1

0

0

0

0

0

0

 

7

PIER PALAKKAD SIDE

1

1

0

0

0

0

0

0

 

8

PIER MOYAN SCHOOL SIDE

3

3

0

0

0

0

0

0

 

10

PIER CAP PALAKKAD SIDE

1

1

0

0

0

0

0

0

 

11

PIER CAP MOYAN SCHOOL SIDE

3

3

0

0

0

0

0

0

 

13

RE/R WALL PALAKKAD  SIDE

100%

20%

80%

0

10.00%

10.00%

0.00%

0.00%

 

14

RE/R WALL MOYAN SCHOOL SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

16

BEAM/SLAB PALAKKAD  SIDE

2

0

2

0

0

0

0

0

 

17

BEAM/SLAB MOYAN SCHOOL SIDE

4

0

4

0

0

0

1

0

Shuttering work in progress

18

BEAM/SLAB RAILWAY SPAN

7

0

7

0

0

0

1

0

 

19

HR/FP/KERB CALICUT  SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

20

HR/FP/KERB NH SIDE

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

21

HR/FP/KERB RAILWAY SPAN

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

22

BC/PAINTING

100%

0

100%

0

0.00%

0.00%

0.00%

0.00%

 

 

 

 

 

 

 

 

 

 

 

 

 

Note: Progress review done based on the revised Program (rev-01)

 

 

 

 

 
Back
 
    
BOWSTRING PEDESTAL CASTING (25.02.2011)

    
    
ERECTION OF I SECTION FOR BOWSTRING GIRDER(25.02.2011)

    
    
P1 PIER CAP (25.02.2011)

    
    
SHUTTERING MATERIALS (23.02.2011)

    
 
    
RETAINING WALL EXCAVATED AREA (23.02.2011)

    
    
PCC FOR RETAINING WALL AT PALAKKAD SIDE (19.02.2011)

      
 

 

 

 

 

 

 

 