Weekly Progress Report - 15.06.2020 to 20.06.2020 |
15.06.2020 |
16.06.2020 |
17.06.2020 |
18.06.2020 |
19.06.2020 |
20.06.2020 |
Third floor cold room inside plastering |
Wash basin steel and shuttering work at 1st floor Ladies toilet |
Wash basin slab shuttering work at 3rd floor Ladies toilet
|
Wash basin slab shuttering work at 3rd floor Ladies toilet
|
Duct block work at 1st floor a Grid A7 |
ELV Wire pulling at 4th floor |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
Fin wall primer coating |
Elevator works at L1,L2 &L3 |
Fire pipe installation works |
ELV Wire pulling at 5th floor |
ELV Wire pulling at 5th floor |
ELV Wire pulling at 4th floor |
First floor duct steel and shuttering work at Grid A4 |
OHT plastering |
OHT external plastering |
Fire pressure test at 7th floor |
|
Granite moulding at 5th floor |
ELV Wire pulling at 4th floor |
|
Plumbing works at ducts |
Plumbing work at Duct |
|
|
Elevator works at L3 |
|