Weekly Progress Report - 08.06.2020 to 13.06.2020 |
08.06.2020 |
09.06.2020 |
10.06.2020 |
11.06.2020 |
12.06.2020 |
13.06.2020 |
Wash basin Granite work |
Main stair Granite flooring |
Granite flooring at the main stair |
Granite flooring at the main stair |
Third floor cold room inside plastering |
Third floor cold room inside plastering |
Elevator works at L1 & L2 |
Elevator works at the L1 & L2 machine room |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
Elevator works at L1 & L2 |
6th floor gents toilet sunken filling |
ELV wire pulling at 6th floor |
Fins plastering |
Tile flooring at 4th floor |
Tile flooring at 4th floor |
First floor duct steel and shuttering work |
Terrace floor primer coating |
Fins plastering |
Installation of Fire sprinkler pipes at 1st & 3rd floor |
Ceiling painting at 7th floor |
Ceiling painting at 6th floor |
OHT external plastering |
Lift machine room terrace water proofing |
Rain water pipe laying at terrace floor |
Plumbing work at the 7th floor gents toilet |
Plumbing work at the 7th floor gents toilet
|
Fire pipe installation at 4th floor |
Plumbing works at ducts |