Prevoius Weekly Reports

   Weekly Progress Report 01.06.2020 - 06.06.2020
    
Weekly Progress Report - 01.06.2020 to 06.06.2020
01.06.2020 02.06.2020 03.06.2020 04.06.2020 05.06.2020 06.06.2020
Formwork preparation/installation for slab at -2.70m level at Zone A No works due to rain Formwork preparation/installation for slab at -2.70m level at Zone A. Formwork preparation/installation for slab at -2.70m level at Zone A. Formwork preparation/installation for slab at -2.70m level, Zone A Formwork preparation/installation for slab at -2.70m level at Zone A
Shuttering works for Retaining wall along Grid F   Shuttering works for Retaining wall along Grid F. Concrete Pouring for Retaining wall along Grid F Reinforcement installation for Stair at Zone A Shuttering works for Columns at Zone A
Reinforcement installation for Lift shaft Columns   Reinforcement installation for Stair at Zone A. Concrete Pouring for Columns at Zone A.   Shuttering works for Columns at Zone A Reinforcement work for columns
   
 
Reinforcement installation for Stair at Zone A. Shuttering Work of Beams  
           
 
Back
 
    
SHUTTERING WORK OF COLUMNS

    
    
RETAINING WALL

    
    
REINFORCEMENT CUTTING AND BENDING

    
    
FORMWORK INSTALLATION FOR SLAB AT -2.70M LEVEL AT ZONE A

    
 
    
BEAM SHUTTERING WORK

    
    
SHUTTERING OF COLUMN

    
    
SHUTTERING WORK OF BEAMS

    
 
    
SHUTTERING OF STAIRCASE

    
    
FORMWORK INSTALLATION FOR SLAB AT -2.70M LEVEL, ZONE A

    
    
CONCRETING

    
 
    
STAIR REINFORCEMENT WORK WORK

    
    
CONCRETING OF RETAINING WALL

    
    
FORM WORK

    
 
    
SHUTTERING WORK FOR RETAINING WALL

    
    
REINFORCEMENT INSTALLATION FOR STAIR

    
    
FORMWORK PREPERATION FOR SLAB

    
 
    
COLUMN SHUTTERING WORK

    
    
REINFORCEMENT CUTTING & BENDING

    
    
REINFORCEMENT WORK AT ENGINEERING BLOCK

    
 
    
RETAINING WALL SHUTTERING WORK

    
    
SHUTTERING WORK OF RETAINING WALL

      
 

 

 

 

 

 

 

 