   Weekly report - 01.06.2020 to 06.06.2020
    
Weekly report - 01.06.2020 to 06.06.2020
01.06.2020 02.06.2020 03.06.2020 04.06.2020 05.06.2020 06.06.2020
Shuttering works at girder P1-P2 Cable profile checking of Girder between P1-P2 Shuttering works at girder P1-P2 Shuttering works at girder P1-P2 Support fixing and alignment of shutters for 2nd girder Girder concrete (1 No.) in P1-P2 span
Bottom shuttering works for A1-P1 Arrangements for girder works at Kuttipuram side Bottom shuttering works for A1-P1 Bottom shuttering works for A1-P1 Arrangements for girder works at Kuttipuram side Arrangements for girder works at Kuttipuram side
Arrangements for girder works at Kuttipuram side   Arrangements for girder works at Kuttipuram side Arrangements for girder works at Kuttipuram side Moisture correction and sieve analysis for aggregates  
 