   Weekly Progress Report 01.06.2020 to 06.06.2020
    
Weekly Progress Report - 01.06.2020 to 06.06.2020
01.06.2020 02.06.2020 03.06.2020 04.06.2020 05.06.2020 06.06.2020
Reinforcement Work for retaining wall (Aroor Side)- 15 m Gabion wall work at Aroor Side- 3 m3 Gabion wall work at Aroor Side- 9 m3 Gabion wall work at Aroor Side- 10.5 m3 Gabion wall work at Aroor Side- 9 m3 Gabion wall work at Aroor Side- 0.5 m3
Electrical Pole Fixing - 9 nos Electrical pole fixing- 5 nos Crash Barrier De-Shuttering Work on Vytila LHS side Crash Barrier Shuttering Work on Vytila RHS side- 25 m Crash barrier shuttering work on Vyttilla side- 24m Electric pole fixing- 7nos
Earth Filling - 120 m3 PCC worke and concrete on sides of kerb - 2 m3 Crash Barrier Shuttering Work on Vytila RHS side- 20 m Putty work- 1 span Putty work- 1 span Crash barrier shuttering work on Vyttilla side- 42m
Excavation at under passage- 63 m3 Putty work- 2 span WMM compaction work on embankment sides of Vyttila side. WMM compaction work on embankment sides of Vyttila side. Electric pole fixing- 5 nos Deck slab cleaning work -250m
Putty work and WMM rolling work WMM compaction -Putty work- 1 span ,       -Drainage Work on Thripunithura side Electrical work  WMM compaction work on embankment sides of Vyttila side. Putty work- 1 span
 
Back
 
    
GABION WALL WORK

    
    
CRASH BARRIER SHUTTERING WORK

    
    
SLAB CLEANING WORK

    
    
PUTTY WORKS

    
 
    
GABION WALL WORK

    
    
CRASH BARRIER SHUTTERING

    
    
ELECTRIC POLE FIXING

    
 
    
PUTTY WORKS

    
    
WMM COMPACTION WORK

    
    
GABION WALL WORKS

    
 
    
CRASH BARRIER SHUTTERING

    
    
GABION WORK

    
    
SHUTTERING WORK

    
 
    
PUTTY WORK

    
    
WMM COMPACTION

    
    
DE-SHUTTERING WORK

    
 
    
SHUTTERING WORK FOR CRASH BARRIER

    
    
GABION WORK

    
    
PUTTY WORK

    
 
    
DRAINAGE WORK

    
    
WMM COMPACTION

    
    
PUTTY WORK

    
 
    
GABION WORK

    
    
ELECTRICAL POLE FIXING

    
    
CONCRETE ON SIDE OF KERB

    
 
    
ELECTRICAL POLE FIXING

    
    
WMM ROLLING

    
    
PUTTY WORK ON SIDES

    
 
    
REINFORCEMENT WORK

    
    
PUTTY WORK ON GIRDERS

    
    
EARTH FILLING

    
 
 
 

 

 

 

 

 

 

 