   Weekly Progress Report 25.05.2020 - 30.05.2020
    
Weekly Progress Report - 25.05.2020 to 30.05.2020
25.05.2020 26.05.2020 27.05.2020 28.05.2020 29.05.2020 30.05.2020
Reinforcement installation and shuttering works of retaining wall at grid F Formwork preparation/installation for slab at -2.70m level at Zone A Formwork preparation for slab at -2.70m level at Zone A Concrete pouring for columns at Zone A & Zone B Formwork preparation/installation for slab at -2.70m level at Zone A

Shuttering works for Stair at Zone A

Shuttering works for Columns  at Zone A and Zone B

Shuttering works for Retaining wall at Grid F Shuttering works for Retaining wall along Grid F Shuttering works for Stair at Zone A Shuttering works for Retaining wall along Grid F

Shuttering works for Retaining wall along Grid F

Reinforcement installation for Columns Shuttering of Sill level slab at Zone B

Shuttering works for the Sill level slab

Concrete pouring for columns at Engineering Block Building Shuttering works for Columns and Stair at Zone A

Shuttering works for Columns at Zone A and Zone B

  Reinforcement installation for columns Shuttering works for Columns at Zone B (2nd lift)   Reinforcement installation for Columns at Zone A and Zone B

Reinforcement installation for Columns at Zone B

   

Reinforcement installation for Columns at Zone B (2nd lift)

  Shuttering works for Columns Formwork preparation/installation for slab at -2.70m level at Zone A
 
Back
 
    
SHUTTERING WORKS FOR STAIR AT ZONE A

    
    
SHUTTERING WORKS FOR RETAINING WALL ALONG GRID F

    
    
SHUTTERING WORKS FOR COLUMNS

    
    
SHUTTERING OF SLAB

    
 
    
SHUTTERING OF COLUMN AT ENGINEERING BLOCK

    
    
REINFORCEMENT INSTALLATION FOR COLUMNS AT ZONE B

    
    
SHUTTERING OF RETAINING WALL

    
 
    
SHUTTERING OF COLUMN

    
    
REINFORCEMENT WORK FOR COLUMN

    
    
REINFORCEMENT WORK FOR COLUMN.

    
 
    
FORMWORK FOR SLAB AT -2.70M LEVEL AT ZONE A

    
    
COLUMN REINFORCEMENT WORK

    
    
CONCRETE POURING FOR COLUMNS AT ZONE A & ZONE B

    
 
    
SHUTTERING WORKS FOR STAIR AT ZONE A

    
    
SHUTTERING WORKS FOR STAIR AT ZONE A

    
    
CONCRETE POURING FOR COLUMNS

    
 
    
SHUTTERING OF COLUMN

    
    
REINFORCEMENT WORK OF COLUMN AT ACADEMIC BUILDING

    
    
REINFORCEMENT WORK OF COLUMN AT ENGINEERING BLOCK

    
 
    
SHUTTERING WORKS FOR RETAINING WALL

    
    
SHUTTERING WORKS FOR THE SILL LEVEL SLAB

    
    
BLOCK WORK

    
 
    
FORMWORK INSTALLATION FOR SLAB AT -2.70M LEVEL

    
    
SHUTTERING WORK OF COLUMN

    
    
REINFORCEMENT WORK OF COLUMN

    
 
    
SHUTTERING OF SILL LEVEL SLAB

    
    
CURING OF RETAINING WALL

    
    
FORM WORK PREPARATION FOR SLAB.

    
 
    
SHUTTERING WORK

    
    
SHUTTERING WORK FOR RETAINING WALL

    
    
REINFORCEMENT WORK

    
 
    
REINFORCEMENT WORK OF COLUMNS AT ENGINEERING BLOCK

    
    
CURING OF RETAINING WALL

    
    
COLUMN SHUTTERING

    
 
 
 

 

 

 

 

 

 

 