SHUTTERING WORKS FOR STAIR AT ZONE A
|
| | |
SHUTTERING WORKS FOR RETAINING WALL ALONG GRID F
|
| | |
SHUTTERING WORKS FOR COLUMNS
|
| | |
SHUTTERING OF SLAB
|
| | |
|
SHUTTERING OF COLUMN AT ENGINEERING BLOCK
|
| | |
REINFORCEMENT INSTALLATION FOR COLUMNS AT ZONE B
|
| | |
SHUTTERING OF RETAINING WALL
|
| | |
|
SHUTTERING OF COLUMN
|
| | |
REINFORCEMENT WORK FOR COLUMN
|
| | |
REINFORCEMENT WORK FOR COLUMN.
|
| | |
|
FORMWORK FOR SLAB AT -2.70M LEVEL AT ZONE A
|
| | |
COLUMN REINFORCEMENT WORK
|
| | |
CONCRETE POURING FOR COLUMNS AT ZONE A & ZONE B
|
| | |
|
SHUTTERING WORKS FOR STAIR AT ZONE A
|
| | |
SHUTTERING WORKS FOR STAIR AT ZONE A
|
| | |
CONCRETE POURING FOR COLUMNS
|
| | |
|
SHUTTERING OF COLUMN
|
| | |
REINFORCEMENT WORK OF COLUMN AT ACADEMIC BUILDING
|
| | |
REINFORCEMENT WORK OF COLUMN AT ENGINEERING BLOCK
|
| | |
|
SHUTTERING WORKS FOR RETAINING WALL
|
| | |
SHUTTERING WORKS FOR THE SILL LEVEL SLAB
|
| | |
BLOCK WORK
|
| | |
|
FORMWORK INSTALLATION FOR SLAB AT -2.70M LEVEL
|
| | |
SHUTTERING WORK OF COLUMN
|
| | |
REINFORCEMENT WORK OF COLUMN
|
| | |
|
SHUTTERING OF SILL LEVEL SLAB
|
| | |
CURING OF RETAINING WALL
|
| | |
FORM WORK PREPARATION FOR SLAB.
|
| | |
|
SHUTTERING WORK
|
| | |
SHUTTERING WORK FOR RETAINING WALL
|
| | |
REINFORCEMENT WORK
|
| | |
|
REINFORCEMENT WORK OF COLUMNS AT ENGINEERING BLOCK
|
| | |
CURING OF RETAINING WALL
|
| | |
COLUMN SHUTTERING
|
| | |
|
|
|