Weekly Progress Report - 18.05.2020 to 23.05.2020 |
18.05.2020 |
19.05.2020 |
20.05.2020 |
21.05.2020 |
22.05.2020 |
23.05.2020 |
External Fins steel and shuttering work
|
Installation of Fire sprinkler pipes
|
Ladies toilet tile work |
Gents toilet inside plastering at 5th floor |
External Fins steel and shuttering work |
Fifth floor tile work |
Lift machine room internal plastering work
|
External Fins steel and shuttering work
|
Installation of Fire sprinkler pipes |
Sunken concreting at 4th floor toilet |
Tile work at fifth floor |
Elevator works |
Elevator works at L1
|
Ladies toilet tile work
|
Gents toilet inside plastering at 5th floor |
Water proofing at 7th floor gents toilet |
Gents toilet inside plastering |
Gents toilet water proofing |
|
Plumbing work at 7th floor Gents toilet
|
Lift machine room plastering
|
Fifth floor tile work |
VDF groove cutting at 5th floor |
VDF groove cutting at 4th floor |
|
Gents toilet inside plastering at 2nd & 5th floor |
Electrical wire pulling at 1st floor
|
Installation of Fire sprinkler pipes |
Plumbing work at gents toilet |
Installation of Fire sprinkler pipes
|