Weekly report - 11.05.2020 to 16.05.2020 |
11.05.2020 |
12.05.2020 |
13.05.2020 |
14.05.2020 |
15.05.2020 |
16.05.2020 |
Reinforcement installation for lower ground floor columns at Zone A.
|
Retaining Wall Concreting at Academic Block |
Reinforcement and shuttering work for Retaining wall along Grid F at Academic Block |
Reinforcement installation and shuttering works of retaining wall at grid F
|
Rebar installation of columns at zone A |
Reinforcement installation for columns at Zone A |
Reinforcement and shuttering works for Retaining walls along Grid F.
|
Steel & Shuttering work of Columns at Zone B |
Reinforcement installation and shuttering works for ground floor columns at Zone B at Academic Block |
Shuttering of Columns and grade beam at Zone B |
Shuttering of columns at zone A
|
Reinforcement installation and shuttering works of retaining wall at grid F
|
Reinforcement installation for ground floor columns at Zone B
|
Shuttering work of Grade Beam at Zone B |
Column reinforcement Installation and Shuttering work from ground floor to first floor level at Engineering Block
|
Concrete casting of columns at Zone A and Zone B
|
Shuttering of retaining wall at grid F
|
Shuttering of Columns at Zone B
|