Prevoius Weekly Reports

   Weekly progress report from 17.04.2017 to 22.04.2017
    
Sl. No.  Description of item Unit SOR Qty.  Qty of Progress on this week  Remarks
1.00 Clearing and grubbing  Ha 3                -    
2.00 Cutting of trees,                    -    
2.01 a) Girth 300mm to 600mm Nos 25                -    
2.02 b) Girth 600mm to 900mm Nos 10                -    
2.03 c)Girth 900mm to 1800mm Nos 5                -    
2.04 Dismantling of existing structures comprising of rubble masonry,  Cum 140                -    
3.00 Dismantling of existing structures comprising of block/brick masonrymasonry, Cum 0                -    
4.00 Dismantling of existing structures comprising of Reinforced cement concrete  Cum 0                -    
5.00 Dismantling of existing structures comprising of cement concrete, Cum 0                -    
6.00 Excavation for roadwayin ordinary soil  Cum 23000                -    
7.00 Loosening,leveling and Compacting orginal ground supporting embankment to facilitate placement of first layerof embankment,scarified to a depth of 150mm, Cum 12500                -    
8.00 Construction of embankment with red earth of approved materials obtained from borrow pits  Cum 220000     4,500.00  
9.00 Construction ofsub grade and earthern shoulders with hard gravelly earth of approved material Cum 45000                -    
10.00 Construction of granular sub-baseby providing coarse graded material,  Cum 13950                -    
11.00 Providing, laying and compacting graded stone aggregate to wet mix macadam  Cum 13030                -    
12.00 Providing, and applying primer coat with bitumen emulsionon prepared surface of granular Base  Sqm 50000                -    
13.00 Providing and applyingtack coat with bitumen 60/70 using emulsion pressure distributor at the rate of 0.20kg/sqm on the prepared bituminous/granular surface  Sqm 100500                -    
14.00 Providing and laying dense graded bituminous macadam Cum 4000                -    
15.00 Providing and layingbituminous concrete Cum 2000                -    
16.00 Construction of cement concrete kerb  Rm 5600                -    
17.00 Providing and laying of hot applied thermoplastic compound2.5mm thick  Sqm 1600                -    
18.00 Providing and fixing of rero-reflectorised cautionary,mandatory and informatory sign as per IRC:67                     -    
18.01 Triangular 900mm size Nos 10                -    
18.02 Circular 600mm size Nos 4                -    
18.03 Informatory/Mandatory Signs 800mm x 600mm Nos 4                -    
18.04 Triangular 600mm size Nos 24                -    
18.05 900mm high octagon Nos 4                -    
19.00 Providing and erecting direction and placeidentificationretro-reflectrorisedsign as per IRC:67                    -    
19.01 Object Hazard Marker for culverts,openings, etc Sqm 4                -    
19.02 Chevron Signs 600mm x 600mm Sqm 3                -    
19.03 Chevron Signs 1200 mm x 600mm Sqm 5                -    
20.00 Providing and erecting direction and placeidentificationretro-reflectrorisedsign as per IRC:67                    -    
21.01 a) Avanced Direction Sign Board (1800x1200mm) Sqm 18                -    
22.00 Supplying and installation of delineators  Nos 1800                -    
23.00 Providing and fixing of road stud100x100mm Nos 120                -    
24.00 Providing & fixing of red reflectorsof approved  quality 100mmx100mm size  Nos 100                -    
25.00 Providing and fixing M-20 grade concrete guard posts 200x200 1.25m Nos 1800                -    
26.00 Earthwork in excavationof foundation of structures for side drain  Cum 1000                -    
27.00 Earthwork in excavationof foundation of structures forculvert work  Cum 2000                -    
28.00 Cement Concrete for plain concrete / reinforced concretefor sub-structureM15  Cum 260  _   
29.00 Cement Concrete for plain concrete / reinforced concrete forM25in foundation , sub structure, super structure etc. Cum 1700                -    
30.00 HYSD barreinforcement complete as per drawings, MT 210                -    
31.00 Painting two coatsafter filling the surface using synthetic enamel paint Sqm 3700                -    
32.00 Random Rubble Masonrywork in cament mortar 1:6 for sub structure Cum 310    
33.00 Providing and constructing Dry rubble masonrywork for retaining wall and foundations Cum 350                -    
34.00 For 5 years Nos 120                -    
35.00 Painting of trees by the road side (Avenue trees) in 0.60m dia holes, 1 m deep dug in the ground  Nos 120                -    
  TOTAL      _   
  EXTRA ITEMS                    -    
E-01 Solid block work in 1:6 in sub-structure  Sqm                  -    
E-02 Plastering with cement mortar (1:4) on brick work in Sqm                  -    
E-03 Providing PVC Pipes Rm                  -    
E-04 Excavator Hiring Charges Hrs                  -    
E-05 Excavator Hiring Charges (NAD Drain cleaning) Hrs                  -    
 
Back
 
    
CH:11+870 TO 12+015(LHS)

    
    
CH:11+870 TO 12+015(LHS)

    
    
CH:12+130 TO CH:12+390(LHS)

    
    
CH:12+130 TO CH:12+390(LHS)

    
 
    
CH:12+015 TO CH:12+130(LHS)

    
    
CH:12+015 TO CH:12+130(LHS)

      
 

 

 

 

 

 

 

 