   Weekly progress report of Airport-Seaport Road Phase II from 06.02.17 to 11.02.17
    
Sl. No.  Description of item Unit SOR Qty.  Qty of Progress on this week  Remarks
1.00 Clearing and grubbing  Ha 3                -    
2.00 Cutting of trees,                    -    
2.01 a) Girth 300mm to 600mm Nos 25                -    
2.02 b) Girth 600mm to 900mm Nos 10                -    
2.03 c)Girth 900mm to 1800mm Nos 5                -    
2.04 Dismantling of existing structures comprising of rubble masonry,  Cum 140                -    
3.00 Dismantling of existing structures comprising of block/brick masonrymasonry, Cum 0                -    
4.00 Dismantling of existing structures comprising of Reinforced cement concrete  Cum 0                -    
5.00 Dismantling of existing structures comprising of cement concrete, Cum 0                -    
6.00 Excavation for roadwayin ordinary soil  Cum 23000                -    
7.00 Loosening,leveling and Compacting orginal ground supporting embankment to facilitate placement of first layerof embankment,scarified to a depth of 150mm, Cum 12500                -    
8.00 Construction of embankment with red earth of approved materials obtained from borrow pits  Cum 220000                -    
9.00 Construction ofsub grade and earthern shoulders with hard gravelly earth of approved material Cum 45000                -    
10.00 Construction of granular sub-baseby providing coarse graded material,  Cum 13950                -    
11.00 Providing, laying and compacting graded stone aggregate to wet mix macadam  Cum 13030                -    
12.00 Providing, and applying primer coat with bitumen emulsionon prepared surface of granular Base  Sqm 50000                -    
13.00 Providing and applyingtack coat with bitumen 60/70 using emulsion pressure distributor at the rate of 0.20kg/sqm on the prepared bituminous/granular surface  Sqm 100500                -    
14.00 Providing and laying dense graded bituminous macadam Cum 4000                -    
15.00 Providing and layingbituminous concrete Cum 2000                -    
16.00 Construction of cement concrete kerb  Rm 5600                -    
17.00 Providing and laying of hot applied thermoplastic compound2.5mm thick  Sqm 1600                -    
18.00 Providing and fixing of rero-reflectorised cautionary,mandatory and informatory sign as per IRC:67                     -    
18.01 Triangular 900mm size Nos 10                -    
18.02 Circular 600mm size Nos 4                -    
18.03 Informatory/Mandatory Signs 800mm x 600mm Nos 4                -    
18.04 Triangular 600mm size Nos 24                -    
18.05 900mm high octagon Nos 4                -    
19.00 Providing and erecting direction and placeidentificationretro-reflectrorisedsign as per IRC:67                    -    
19.01 Object Hazard Marker for culverts,openings, etc Sqm 4                -    
19.02 Chevron Signs 600mm x 600mm Sqm 3                -    
19.03 Chevron Signs 1200 mm x 600mm Sqm 5                -    
20.00 Providing and erecting direction and placeidentificationretro-reflectrorisedsign as per IRC:67                    -    
21.01 a) Avanced Direction Sign Board (1800x1200mm) Sqm 18                -    
22.00 Supplying and installation of delineators  Nos 1800                -    
23.00 Providing and fixing of road stud100x100mm Nos 120                -    
24.00 Providing & fixing of red reflectorsof approved  quality 100mmx100mm size  Nos 100                -    
25.00 Providing and fixing M-20 grade concrete guard posts 200x200 1.25m Nos 1800                -    
26.00 Earthwork in excavationof foundation of structures for side drain  Cum 1000                -    
27.00 Earthwork in excavationof foundation of structures forculvert work  Cum 2000                -    
28.00 Cement Concrete for plain concrete / reinforced concretefor sub-structureM15  Cum 260          46.80  
29.00 Cement Concrete for plain concrete / reinforced concrete forM25in foundation , sub structure, super structure etc. Cum 1700                -    
30.00 HYSD barreinforcement complete as per drawings, MT 210                -    
31.00 Painting two coatsafter filling the surface using synthetic enamel paint Sqm 3700                -    
32.00 Random Rubble Masonrywork in cament mortar 1:6 for sub structure Cum 310          94.00  
33.00 Providing and constructing Dry rubble masonrywork for retaining wall and foundations Cum 350                -    
34.00 For 5 years Nos 120                -    
35.00 Painting of trees by the road side (Avenue trees) in 0.60m dia holes, 1 m deep dug in the ground  Nos 120                -    
  TOTAL                    -    
  EXTRA ITEMS                    -    
E-01 Solid block work in 1:6 in sub-structure  Sqm                  -    
E-02 Plastering with cement mortar (1:4) on brick work in Sqm                  -    
E-03 Providing PVC Pipes Rm                  -    
E-04 Excavator Hiring Charges Hrs                  -    
E-05 Excavator Hiring Charges (NAD Drain cleaning) Hrs                  -    
 
Back
 
    
BACK FILLING OF CULVERT ON CH:12+555(GAIL)

    
    
RR FOR SIDE DRAIN FROM CH:13+385 TO 13+490(RHS)

    
    
R R DRAIN PCC 13+450 TO 13+490 RHS

      
 

 

 

 

 

 

 

 