   Progress report of Airport Seaport Road Phase II Section A Package 1-31.10.2016
    
CONSTRUCTION OF AIR PORT SEA PORT ROAD PHASE II, SECTION -A, PACKAGE -1
PACKAGE I HMT TO NAD KM 11350 TO KM 14000
MONTHLY REPORT FOR THE MONTH OF OCTOBER 2016
Sl.No Description Of Items Unit Quantity as per Tender Work done during the month October -16 Quantity of work planned October -16 % Work done  Remarks 
1.01 Clearing and grubbing  Ha 3.00     0.00  
1.02 Cutting of trees, Nos       0.00  
  a) Girth 300mm to 600 mm   25.00     0.00  
  b) Girth 600mm to 900mm   10.00     0.00  
  c) Girth 900mm to1800mm   5.00     0.00  
1.03 Dismantlingof existing structures  comprising of rubble masonry,  Cum 140.00     0.00  
1.04 Dismantling of existing structures comprising of block/brick masonry Cum 45.00     0.00  
1.05 Dismantling of existing structures comprising of Reinforced cement concrete  Cum 40.00     0.00  
1.06 Dismantling of existing structures comprising of  cement concrete  Cum 32.00     0.00  
1.07 Excavation for roadway in ordinary soil including removal of unsuitable top soil Cum 23,000.00     0.00  
1.08  Loosening, leveling and Compacting original ground supporting embankment  Cum 12,500.00     0.00  
1.09 Construction of embankment with red earthof approved materials obtained from borrow pits  Cum 220,000.00   25000.00 0.00  
1.10 Construction of subgradeand earthen shoulders with hard gravelly earth of approved material satisfying the requirement of minimum soaked CBR value of 10,  Cum 45,000.00     0.00  
1.11 Construction of granular sub-baseby providing coarse graded material,  Cum 13,950.00   30.00 0.00  
1.12 Providing, laying,and compacting graded stone aggregate towet mix macadam  Cum 13,030.00     0.00  
1.13 Providing and applying primer coatwith bitumen emulsion on prepared surface of granular Base in Sqm 50,000.00     0.00  
1.14 Providing and applying tack coatwith bitumen 60/70 using emulsion pressure distributor at the rate of 0.20kg per sqm specification 503. Sqm 100,500.00     0.00  
1.15 Providing and laying dense graded bituminous macadamwith 100-120 TPH batch type HMP  Cum 4,000.00     0.00  
1.16 Providing and laying bituminous concretewith 100-120 TPH batch type hot mix plant  Cum 2,000.00     0.00  
1.17 Construction of cement concrete kerbwith channel with top and bottom  Rm 5,600.00     0.00  
1.18 Providing and laying of hot applied thermoplastic compound 2.5 mm thick Sqm 1,600.00     0.00  
1.19 Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67          0.00  
a Triangular 900 mm size Nos 10.00     0.00  
b Circular 600 mm size Nos 4.00     0.00  
c Informatory/Mandatory Signs 800mmx600mm Nos 4.00     0.00  
Triangular 600 mm size Nos 24.00     0.00  
e 900 mm high octagon Nos 4.00     0.00  
1.20 Providing and erecting direction and placeidentification retro-reflectorised signas per IRC:67          0.00  
a  Object Hazard Marker for culverts,openings etc. sqm 4.00     0.00  
b Chevron Signs 600mm x 600mm sqm 3.00     0.00  
c Chevron Signs 1200mm x 600mm sqm 5.00     0.00  
1.21 Providing and erecting direction and placeidentification retro- reflectorised sign as per IRC :67 m         0.00  
  a) Advanced Direction Sign Board (1800x1200 mm) sqm 18.00     0.00  
1.22 Supplying and installation of delineators(road way indicators, hazard markers, object markers), 80-100 cm high  Nos 1,800.00     0.00  
1.23 Providing and fixing ofroad stud100x 100 mm, die-cast in aluminium, resistant to corrosive effect  Nos 120.00     0.00  
1.24 Providing & fixing ofred reflectorsof approved quality 100mmx100mm size on guard posts and on other structures using cement mortar all complete  Nos 100.00     0.00  
1.25 Providing and fixing M-20 grade concrete guard posts  200 X 200 mm x 1.250 m long  Nos 1,800.00     0.00  
1.26 Earth work in excavation of foundation of structures as per drawing  Cum 1,000.00     0.00  
1.27 Earth work in excavation of foundation of structures as per drawing and technical specification,  Cum 2,000.00 150.00 200.00 75.00  
1.28 Cement concrete for plain concrete / reinforced concretefor sub-structure,PCC  M15 Cum 260.00 18.00 20.00 90.00  
1.29 Cement concrete for plain concrete / reinforced concrete for sub-structure/super structure etc.M25 Cum 1,700.00 40.00 120.00 33.33  
1.30 HYSD barreinforcement complete as per drawings ,c MT 210.00 5.00 12.00 41.67  
1.31 Painting two coatsafter filling the surface using synthetic enamel paint TH. Sqm 3,700.00     0.00  
1.32 Random Rubble Masonrywork in cament mortar 1:6  Cum 310.00 315.00 150.00 210.00  
1.33 Providing and constructing Dry rubble masonrywork for retaining wall Cum 350.00     0.00  
1.34 Planting trees  Nos 120.00     0.00  
1.35 Tree guard  Nos 120.00     0.00  
1.36 Solid block work  Cum       0.00  
1.37 Plastering  Sqm        0.00  
  GRAND TOTAL            
 
Back
 
    
FIG. 3 BOX CULVERT COMPLETED AT 13+060

    
    
PCC FOR DRAIN IS IN PROGRESS

    
    
FIG. 2 SIDE DRAIN EXCAVATED AREA IS FILLED WITH WATER

    
    
FIG.1. BOX CULVERT WORK COMPLETED AT 13+260

    
 
 
 

 

 

 

 

 

 

 